Trial Operation and Testing

1. 

Trial operation and testing

1-1 Measure the supply voltage and make sure that it falls in the specified range.
1-2 Trial operation should be carried out in either cooling or heating mode.

• In cooling mode, select the lowest programmable temperature; in heating mode, select the highest programmable 

temperature.
1) Trial operation may be disabled in either mode depending on the room temperature.
2) After trial operation is complete, set the temperature to a normal level (26°C to 28°C in cooling mode, 20°C to 24°C in 

heating mode).

3) For protection, the system disables restart operation for 3 minutes after it is turned off.

1-3 Carry out the test operation in accordance with the operation manual to ensure that all functions and parts, 

such as louver movement, are working properly.

• The air conditioner requires a small amount of power in its standby mode. If the system is not to be used for some 

time after installation, shut off the circuit breaker to eliminate unnecessary power consumption.

• If the circuit breaker trips to shut off the power to the air conditioner, the system will restore the original operation 

mode when the circuit breaker is opened again.

2. 

Test items

Test items

Symptom

Check

Indoor and outdoor units are installed properly on solid bases.

Fall, vibration, noise

No refrigerant gas leaks.

Incomplete cooling/heating 
function

Refrigerant gas and liquid pipes and indoor drain hose extension are 
thermally insulated.

Water leakage

Draining line is properly installed.

Water leakage

System is properly earthed.

Electrical leakage

The specified wires are used for inter-unit wiring.

Inoperative or burn damage

Indoor or outdoor unit’s air inlet or outlet has clear path of air.

Incomplete cooling/heating 
function

Stop valves are opened.

Incomplete cooling/heating 
function

Indoor unit properly receives remote control commands.

Inoperative

01_EN_3P297037-2D.indd   11

11/1/2012   11:04:44 AM

Summary of Contents for RXS20K2V1B

Page 1: ...ation S rie split R410A Montagehandleiding R410A Split systeem Manual de instalaci n Serie Split R410A Manuale dinstallazione Serie Multiambienti R410A R410A Manual de Instala o S rie split R410A R410...

Page 2: ...e 2006 95 EC Electromagnetic Compatibility 2004 108 EC 3SB64564 12E Shinri Sada Manager Quality Control Department DAIKIN TCF 015 N4 09 2010 RXS20J2V1B RXS25J2V1B RXS35J2V1B RKS20J2V1B RKS25J2V1B RKS3...

Page 3: ...ES LTD Low Voltage 2006 95 EC Electromagnetic Compatibility 2004 108 EC 3SB65451 3 RXS20K2V1B RXS25K2V1B Shinri Sada Manager Quality Control Department DAIKIN TCF 015 N20 09 2011 DEKRA Certification B...

Page 4: ...meda Center Bldg 2 4 12 Nakazaki Nishi Kita ku Osaka 530 8323 Japan RXS20K2V1B RXS25K2V1B 3SB65451 4 Shinri Sada Manager Quality Control Department 3SB65451 4 fm Page 1 Thursday October 27 2011 4 49 P...

Page 5: ...AIKIN TCF 015 P7 07 2012 DEKRA Certification B V NB0344 74736 KRQ EMC97 4957 3SB65451 14D Shinri Sada Manager Quality Control Department RXS20K3V1B RXS25K3V1B Machinery 2006 42 EC Electromagnetic Comp...

Page 6: ...5 2 40 DAIKIN TCF 015 P9 09 2012 DEKRA Certification B V NB0344 74736 KRQ EMC97 4957 3SB65451 18F Shinri Sada Manager Quality Control Department RXS35K2V1B Machinery 2006 42 EC Electromagnetic Compati...

Page 7: ...3SB65451 4 fm Page 2 Thursday October 27 2011 4 49 PM...

Page 8: ...terminals If refrigerant gas leaks during installation ventilate the area immediately Toxic gas may be produced if the refrigerant comes into contact with fire After completing installation check for...

Page 9: ...m television and radio sets This is to prevent interference to images and sounds Noises may be heard even if they are more than 3m away depending on radio wave conditions 8 In coastal areas or other p...

Page 10: ...ove the screw on the stop valve cover Slide the lid downward to remove it How to attach the stop valve cover Insert the upper part of the stop valve cover into the outdoor unit to install Tighten the...

Page 11: ...the unit securely by means of the foundation bolts Prepare 4 sets of M8 or M10 foundation bolts nuts and washers each which are available on the market It is best to screw in the foundation bolts unt...

Page 12: ...lifetime The drying material may dissolve and damage the system Incomplete flaring may cause refrigerant gas leakage 4 Refrigerant piping work CAUTION Use the flare nut fixed to the main unit To preve...

Page 13: ...52W mK 0 035 to 0 045kcal mh C Refrigerant gas pipe s surface temperature reaches 110 C max Choose heat insulation materials that will withstand this temperature 2 Be sure to insulate both the gas and...

Page 14: ...nifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no operation 3 Do vacuum pumping and make sure that the compound pressure gauge...

Page 15: ...nd manifold for charging The lled out label must be adhered in the proximity of the product charging port e g onto the inside of the stop valve cover NOTE National implementation of EU regulation on c...

Page 16: ...peration press the switch SW1 1 2 3 The selective connector for standby electricity saving in use with standby electricity saving function turned off Push Screwdriver Power supply terminal block Force...

Page 17: ...Earth leakage circuit breaker Earth Inter unit wire 4 core 1 5mm or more H05RN Firmly x the wires with the terminal screws Outdoor unit Indoor unit Power supply 50Hz 220 240V Firmly x the wires with t...

Page 18: ...r in its standby mode If the system is not to be used for some time after installation shut off the circuit breaker to eliminate unnecessary power consumption If the circuit breaker trips to shut off...

Page 19: ...Two dimensional bar code is a code for manufacturing 3P297037 2D M12B067A 1210 HT 00_CV_3P297037 2D indd 2 11 1 2012 11 01 11 AM...

Reviews: