![background image](http://html1.mh-extra.com/html/daikin/rxn25kev1b/rxn25kev1b_service-manual_2459929014.webp)
Removal of Electrical Box / PCB
Si001161
12
Removal Procedure
2. Remove the electrical box.
Some models have no
screw.
1
Remove the screw and
remove the electrical
box.
3. Remove the reactor.
Some models have more
screws.
1
Remove the screw and
remove the reactor.
4. Remove the thermistors.
Pay attention so as not to
lose the fixture.
When reassembling, do not
insert the thermistor up to
the dent of fixture.
1
Release the discharge
pipe thermistor.
Step
Procedure
Points
Electrical box
(R15879)
Reactor
(R15885)
Discharge pipe
thermistor
(R14518)
Dent
Fixture
(R11740)