![Daikin RXN25KEV1B Service Manual Download Page 12](http://html1.mh-extra.com/html/daikin/rxn25kev1b/rxn25kev1b_service-manual_2459929012.webp)
Removal of Electrical Box / PCB
Si001161
10
Removal Procedure
18
Release the harnesses
of the relay connector
and the reactor from the
groove.
19
Release the lead wires
of the power supply and
the earth wire from the
groove.
20
Remove the electrical
box cover and
insulation sheet.
Step
Procedure
Points
(R14510)
(R14581)
Electrical box cover
(R14511)
Insulation
sheet