background image

English

7

Outdoor Unit Installation

5.

Refilling the refrigerant.

Check the type of refrigerant to be used on the machine nameplate.

Precautions when adding R410A
Fill from the liquid pipe in liquid form.

It is a mixed refrigerant, so adding it in gas form may cause the refrigerant composition to change, preventing normal operation.
1) Before filling, check whether the cylinder has a siphon attached or not. (It should have something like “liquid filling siphon 

attached” displayed on it.)

• Be sure to use the R410A tools to ensure pressure and to prevent foreign objects entering.

NOTE

National implementation of EU regulation on certain fluorinated greenhouse gases may require to provide the appropriate official 
national language on the unit. Therefore an additional multilingual fluorinated greenhouse gases label is supplied with the unit. 

 

Sticking instructions are illustrated on the backside of that label. 

6.

Refrigerant piping work.

6-1 Cautions on pipe handling.

1) Protect the open end of the pipe against dust and moisture.
2) All pipe bends should be as gentle as possible. Use a pipe bender 

for bending.

6-2 Selection of copper and heat insulation materials.

When using commercial copper pipes and fittings, observe the following:
1) Insulation material:  Polyethylene foam 

 

Heat transfer rate:  0.041 to 0.052W/mK (0.035 to 0.045kcal/(mh •°C))
Refrigerant gas pipe’s surface temperature reaches 110°C max.

 

Choose heat insulation materials that will withstand this temperature.

2) Be sure to insulate both the gas and liquid piping and to provide insulation 

dimensions as below.

3) Use separate thermal insulation for gas and liquid refrigerant pipes.

Gas side

Liquid side

Gas pipe 

thermal insulation

Liquid pipe 

thermal insulation

O.D. 9.5mm

O.D. 6.4mm

I.D. 12-15mm

I.D. 8-10mm

Minimum bend radius

Thickness 10mm Min.

30mm or more

Thickness 0.8mm (C1220T-O)

Filling a cylinder with an attached siphon

Stand the cylinder upright when 
filling.

There is a siphon pipe inside, so the 
cylinder need not be upside-down to 
fill with liquid.

Filling other cylinders

Turn the cylinder upside-down 
when filling.

3

5

6

2

1

4

Please fill in with indelible ink, 

n

1

  the factory refrigerant charge of the product, 

n

2

  the additional refrigerant amount charged in the field and

n

1  +  2

  the total refrigerant charge 

on the refrigerant charge label supplied with the product.

Important information regarding the refrigerant used

This product contains fluorinated greenhouse gases covered by 
the Kyoto Protocol. Do not vent gases into the atmosphere.

Refrigerant type:

R410A

GWP

(1)

 value:

1975

 

(1) 

GWP = global warming potential 

1

factory refrigerant charge of the 
product: 
see unit name plate 

2

additional refrigerant amount 
charged in the field 

3

total refrigerant charge 

4

Contains fluorinated greenhouse 
gases covered by the Kyoto 
Protocol

5

outdoor unit

6

refrigerant cylinder and manifold 
for charging

The filled out label must be adhered in the 
proximity of the product charging port (e.g. 
onto the inside of the stop valve cover).

Wall

If no flare cap is 
available, cover 
the flare mouth 
with tape to keep 
dirt or water out.

Be sure to 
place a cap.

Rain

Gas pipe

Liquid pipe

Gas pipe 
insulation

Liquid pipe 
insulation

Finishing tape

Drain hose

Inter-unit wiring

Summary of Contents for RXLG25L2V1B RXLG35L2V1B

Page 1: ...INSTALLATION MANUAL R410A Split Series MODEL RXLG25L2V1B RXLG35L2V1B RXL35K2V1B RXL25J3V1B RXL35J3V1B RXL20K3V1B RXL25K3V1B RXLG25K3V1B RXLG35K3V1B...

Page 2: ...y es valorado positivamente por B de acuerdo con el Certificado C 06 Nota delineato nel A e giudicato positivamente da B secondo l Certificato C 07 A B C 08 Nota tal como estabelecido em A e com o par...

Page 3: ...A y es valorado positivamente por B de acuerdo con el Certificado C 06 Nota delineato nel A e giudicato positivamente da B secondo l Certificato C 07 A B C 08 Nota tal como estabelecido em A e com o p...

Page 4: ...o positivamente por B de acuerdo con el Certificado C 06 Nota delineato nel A e giudicato positivamente da B secondo l Certificato C 07 A B C 08 Nota tal como estabelecido em A e com o parecer positiv...

Page 5: ...abnormal heat build up or fire When wiring the power supply and connecting the wiring between the indoor and outdoor units position the wires so that the control box lid can be securely fastened Impr...

Page 6: ...not place under the unit anything which must be kept away from moisture NOTE Cannot be installed hanging from ceiling or stacked CAUTION When operating the air conditioner in a low outdoor ambient tem...

Page 7: ...top valve cover into the outdoor unit to install Tighten the screws Stop valve cover O D 9 5mm Gas pipe Liquid pipe O D 6 4mm 20g m 15m 20m Max allowable length Max allowable height Additional refrige...

Page 8: ...fix the unit securely by means of the foundation bolts Prepare four sets of M8 or M10 foundation bolts nuts and washers each which are available on the market It is best to screw in the foundation bol...

Page 9: ...orque wrenches when tightening the flare nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them ful...

Page 10: ...n side of charging hose which comes from gauge manifold to gas stop valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressu...

Page 11: ...id piping and to provide insulation dimensions as below 3 Use separate thermal insulation for gas and liquid refrigerant pipes Gas side Liquid side Gas pipe thermal insulation Liquid pipe thermal insu...

Page 12: ...n 1 Check that the main power supply is turned OFF Turn it OFF if has not been turned OFF 2 Remove the stop valve cover 3 Disconnect the selective connector for standby electricity saving 4 Turn ON th...

Page 13: ...AUTION 1 When pressing the switch do not touch the terminal block It has a high voltage so doing so may cause electric shock 2 After closing the liquid stop valve close the gas stop valve within three...

Page 14: ...notes mentioned below when wiring to the power supply terminal board Precautions to be taken for power supply wiring Use a round crimp style terminal for connection to the power supply terminal board...

Page 15: ...5 C6 C119 Capacitor DB1 DB2 DB3 Diode bridge E1H Heater FU1 FU2 FU3 FU4 FU5 Fuse FU6 Field fuse IPM1 IPM2 Intelligent power module L Live L1 Coil L1R Reactor M1C Compressor motor M1F Fan motor MRCW MR...

Page 16: ...requires a small amount of power in its standby mode If the system is not to be used for some time after installation shut off the circuit breaker to eliminate unnecessary power consumption If the ci...

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ...3P291651 8R 2013 12 Copyright 2013 Daikin...

Reviews: