background image

English

6

E

n

g

li

s

h

4.

Purging air and checking gas leakage.

• When piping work is completed, it is necessary to purge the air and check for gas leakage.

 WARNING

1) Do not mix any substance other than the specified refrigerant (R410A) into the refrigeration cycle.
2) When refrigerant gas leaks occur, ventilate the room as soon and as much as possible.
3) R410A, as well as other refrigerants, should always be recovered and never be released directly into the environment.
4) Use a vacuum pump for R410A exclusively. Using the same vacuum pump for different refrigerants may damage the vacuum 

pump or the unit.

• If using additional refrigerant, perform air purging from the refrigerant pipes and 

indoor unit using a vacuum pump, then charge additional refrigerant.

• Use a hexagonal wrench (4mm) to operate the stop valve rod.
• All refrigerant pipe joints should be tightened with a torque wrench at the specified 

tightening torque.

*1. Pipe length vs. vacuum pump run time.  

*2. If the compound pressure gauge pointer swings back, refrigerant may have water content or a loose pipe joint may exists.  Check 

all pipe joints and retighten nuts as needed, then repeat steps 2) through 4).

1) Connect projection side of charging hose (which comes from gauge manifold) to gas stop valve’s service port.

2) Fully open gauge manifold’s low-pressure valve (Lo) and completely close its high-pressure valve (Hi).  

(High-pressure valve subsequently requires no operation.)

3)  Do vacuum pumping and make sure that the compound pressure gauge reads –0.1MPa (–76cmHg)*1.

4) Close gauge manifold’s low-pressure valve (Lo) and stop vacuum pump.  

(Keep this state for a few minutes to make sure that the compound pressure gauge pointer does not swing back.)*2.

5) Remove caps from liquid stop valve and gas stop valve.

6) Turn the liquid stop valve’s rod 90 degrees counterclockwise with a hexagonal wrench to open valve. 

Close it after 5 seconds, and check for gas leakage.
Using soapy water, check for gas leakage from indoor unit’s flare and outdoor unit’s flare and valve rods.  
After the check is complete, wipe all soapy water off.

7) Disconnect charging hose from gas stop valve’s service port, then fully open liquid and gas stop valves.

(Do not attempt to turn valve rod beyond its stop.)

8) Tighten valve caps and service port caps for the liquid and gas stop valves with a torque wrench at the specified torques.

Pipe length

Up to 15 metres

More than 15 metres

Run time

Not less than 10 min.

Not less than 15 min.

Compound 
pressure gauge

Pressure 
meter

High-
pressure 
valve

Low-pressure 
valve

Vacuum pump

Service port

Liquid 
stop 
valve

Valve caps

Gas stop valve

Charging 
hoses

Gauge 
manifold

01_EN_3P232550-9C.fm  Page 6  Thursday, September 16, 2010  11:23 AM

Summary of Contents for RXL20J2V1B

Page 1: ...handbok Installasjonsh ndbok Asennusohje Installierungshandbuch Manuel d installation Instrukcja montazu Installatiehandleiding R410A Split Series 00_CV_3P232550 9C fm Page 1 Thursday September 16 201...

Page 2: ...XL20J2V1B RXL25J2V1B RXL35J2V1B RXLG25K2V1B RXLG35K2V1B Low Voltage 2006 95 EC Electromagnetic Compatibility 2004 108 EC DAIKIN TCF 015N15 04 2011 DEKRA NB0344 74736 KRQ EMC97 4957 3P290872 5 Takayuki...

Page 3: ...ntrol box lid may result in electric shocks fire or over heating terminals If refrigerant gas leaks during installation ventilate the area immediately Toxic gas may be produced if the refrigerant come...

Page 4: ...y are more than 3 meter away depending on radio wave conditions 8 In coastal areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the air conditioner 9 Since dr...

Page 5: ...r unit to install Tighten the screws Stop valve cover O D 9 5mm Gas pipe Liquid pipe O D 6 4mm 20g m 15m 20m Max allowable length Max allowable height Additional refrigerant required for refrigerant p...

Page 6: ...s of the foundation bolts Prepare four sets of M8 or M10 foundation bolts nuts and washers each which are available on the market It is best to screw in the foundation bolts until their length are 20m...

Page 7: ...ightening the flare nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them fully with the torque wr...

Page 8: ...p valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no operation 3 Do vacuum pumping an...

Page 9: ...rmal insulation O D 9 5mm O D 6 4mm I D 12 15mm I D 8 10mm Minimum bend radius Thickness 10mm Min 30mm or more Thickness 0 8mm C1220T O Filling a cylinder with an attached siphon Stand the cylinder up...

Page 10: ...FF if has not been turned OFF 2 Remove the stop valve cover 3 Disconnect the selective connector for standby electricity saving 4 Turn ON the main power supply CAUTION 1 Before connecting or disconnec...

Page 11: ...ressing the switch do not touch the terminal block It has a high voltage so doing so may cause electric shock 2 After closing the liquid stop valve close the gas stop valve within three minutes then s...

Page 12: ...iring to the power supply terminal board Precautions to be taken for power supply wiring Use a round crimp style terminal for connection to the power supply terminal board In case it cannot be used du...

Page 13: ...in its standby mode If the system is not to be used for some time after installation shut off the circuit breaker to eliminate unnecessary power consumption If the circuit breaker trips to shut off t...

Reviews: