background image

9

English

Pump Down Operation

In order to protect the environment, be sure to pump down when relocating or disposing of the unit.

1) Remove the valve cap from liquid stop valve and gas stop valve.
2) Carry out forced cooling operation.
3) After five to ten minutes, close the liquid stop valve with a hexagonal wrench.
4) After two to three minutes, close the gas stop valve and stop forced cooling operation.

How to forced cooling operation mode

Using the indoor unit ON/OFF button 

Press the indoor unit ON/OFF button for at least 5 seconds. (Operation will start.)

• Forced cooling operation will stop automatically after around 15 minutes. 

To force a trial operation to stop, press the indoor unit ON/OFF button.

Using the main unit’s remote controller

1) Press the “ON/OFF” button. (Operation will start.)
2) Press the “TEMP” button and the “MODE” button at the same time.
3) Press the “MODE” button twice.

(“

” will be displayed and the unit will enter trial operation.)

4) Press the “MODE” button to return the operation mode to cooling.

• Trial operation will stop automatically after around 30 minutes. To force a trial 

operation to stop, press the “ON/OFF” button.

Using the outdoor unit forced cooling operation switch (with standby 
electricity saving function turned OFF)

1) Push on “

” with a screwdriver. The unit will start operating.

2) The forced cooling mode is selected, and terminates in approx. 15 minutes.

 CAUTION

1) When pressing the switch, do not touch the terminal block. It has a high voltage, so doing so may cause electric shock.
2) After closing the liquid stop valve, close the gas stop valve within three minutes, then stop the forced operation.

Cooling at low outdoor temperature

(

RXL20/25/35J2V1

B

)

This function is limited only for facilities (the target of air conditioning is equipment (such as computer)). Never use it in 
a residence or office (the space where there is a human).

1) Cutting jumper 4 (J4) on the circuit board will expand the operation range down to –15°C. However it will stop if the outdoor 

temperature drops below –20°C and start back up once the temperature rises again.

 CAUTION

1) If the outdoor unit is installed where the heat exchanger of the unit is exposed to direct wind, provide a windbreak wall.
2) Intermittent noises may be produced by the indoor unit due to the outdoor fan turning on and off when using facility settings.
3) Do not place humidifiers or other items which might raise the humidity in rooms where facility settings are being used. 

A humidifier might cause dew jumping from the indoor unit outlet vent.

4) Cutting jumper 4 (J4) sets the indoor fan tap to the highest position. Notify the user about this.

Gas 
stop valve

Valve cap

Hexagonal 
wrench

Close

Liquid 
stop valve

1

2

3

The selective connector for standby electricity 
saving in use (with standby electricity saving 
function turned OFF)

Push here

Screwdriver

Power supply
terminal block

1

2

3

S70

S40

S2

S90

J5

J4

J3

Cut J4 with nippers 
or a similar tools.

01_EN_3P232550-9C.fm  Page 9  Thursday, September 16, 2010  11:23 AM

Summary of Contents for RXL20J2V1B

Page 1: ...handbok Installasjonsh ndbok Asennusohje Installierungshandbuch Manuel d installation Instrukcja montazu Installatiehandleiding R410A Split Series 00_CV_3P232550 9C fm Page 1 Thursday September 16 201...

Page 2: ...XL20J2V1B RXL25J2V1B RXL35J2V1B RXLG25K2V1B RXLG35K2V1B Low Voltage 2006 95 EC Electromagnetic Compatibility 2004 108 EC DAIKIN TCF 015N15 04 2011 DEKRA NB0344 74736 KRQ EMC97 4957 3P290872 5 Takayuki...

Page 3: ...ntrol box lid may result in electric shocks fire or over heating terminals If refrigerant gas leaks during installation ventilate the area immediately Toxic gas may be produced if the refrigerant come...

Page 4: ...y are more than 3 meter away depending on radio wave conditions 8 In coastal areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the air conditioner 9 Since dr...

Page 5: ...r unit to install Tighten the screws Stop valve cover O D 9 5mm Gas pipe Liquid pipe O D 6 4mm 20g m 15m 20m Max allowable length Max allowable height Additional refrigerant required for refrigerant p...

Page 6: ...s of the foundation bolts Prepare four sets of M8 or M10 foundation bolts nuts and washers each which are available on the market It is best to screw in the foundation bolts until their length are 20m...

Page 7: ...ightening the flare nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them fully with the torque wr...

Page 8: ...p valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no operation 3 Do vacuum pumping an...

Page 9: ...rmal insulation O D 9 5mm O D 6 4mm I D 12 15mm I D 8 10mm Minimum bend radius Thickness 10mm Min 30mm or more Thickness 0 8mm C1220T O Filling a cylinder with an attached siphon Stand the cylinder up...

Page 10: ...FF if has not been turned OFF 2 Remove the stop valve cover 3 Disconnect the selective connector for standby electricity saving 4 Turn ON the main power supply CAUTION 1 Before connecting or disconnec...

Page 11: ...ressing the switch do not touch the terminal block It has a high voltage so doing so may cause electric shock 2 After closing the liquid stop valve close the gas stop valve within three minutes then s...

Page 12: ...iring to the power supply terminal board Precautions to be taken for power supply wiring Use a round crimp style terminal for connection to the power supply terminal board In case it cannot be used du...

Page 13: ...in its standby mode If the system is not to be used for some time after installation shut off the circuit breaker to eliminate unnecessary power consumption If the circuit breaker trips to shut off t...

Reviews: