6 Installation
Installer and user reference guide
24
RWEYQ8~1 RWEYQ8~14T9Y1B
VRV IV water-cooled system air conditioner
4P452191-1 – 2017.04
NOTICE
Precautions when connecting field piping. Add brazing
material as shown in the figure.
1
1
1
1
2
2
≤Ø25.4
>Ø25.4
NOTICE
▪ Be sure to use the supplied accessory pipes when
carrying out piping work in the field.
▪ Be sure that the field installed piping does not touch
other pipes, the bottom panel or side panel. Especially
for the bottom and side connection, be sure to protect
the piping with suitable insulation, to prevent it from
coming into contact with the casing.
Connect the stop valves to the field piping using the accessory pipes
supplied with the unit.
The connections to the branch kits are the responsibility of the
installer (field piping).
6.4.5
To connect the multi connection piping kit
NOTICE
Improper installation may lead to malfunction of the
outdoor unit.
▪ Install the joints horizontally, so that the caution label (a) attached
to the joint comes to the top.
▪ Do not tilt the joint more than 7.5° (see view A).
▪ Do not install the joint vertically (see view B).
a
a
A
B
7.5°
7.5°
a
Caution label
X
Not allowed
O
Allowed
▪ Make sure that the total length of the piping connected to the joint
is absolute straight for more than 500 mm. Only if a straight field
piping of more than 120 mm is connected, more than 500 mm of
straight section can be ensured.
>120 mm
>500 mm
6.4.6
To connect the refrigerant branching kit
For installation of the refrigerant branching kit, refer to the installation
manual delivered with the kit.
▪ Mount the refnet joint so that it branches either horizontally or
vertically.
▪ Mount the refnet header so that it branches horizontally.
A
B
±3
0
°
a
b
c
a
a
Horizontal surface
b
Refnet joint mounted vertically
c
Refnet joint mounted horizontally
6.4.7
To protect against contamination
Protect the piping as described in the following table to prevent dirt,
liquid or dust from entering the piping.
Unit
Installation period
Protection method
Outdoor unit
>1 month
Pinch the pipe
<1 month
Pinch or tape the pipe
Indoor unit
Regardless of the
period
Seal the piping and wiring intake holes using sealing material (field
supply), otherwise the capacity of the unit will drop and small
animals may enter the machine.
If the gaps are not properly sealed, sound level will increase and
sweat problems can occur.
6.4.8
To braze the pipe end
NOTICE
Precautions when connecting field piping. Add brazing
material as shown in the figure.
1
1
1
1
2
2
≤Ø25.4
>Ø25.4
▪ When brazing, blow through with nitrogen to prevent creation of
large quantities of oxidised film on the inside of the piping. This
film adversely affects valves and compressors in the refrigerating
system and prevents proper operation.
▪ Set the nitrogen pressure to 20 kPa (0.2 bar) (just enough so it
can be felt on the skin) with a pressure-reducing valve.
a
b
c
d
e
f
f
a
Refrigerant piping
b
Part to be brazed
c
Taping
d
Manual valve
e
Pressure-reducing valve