The minimal piping length should be 7.5 

m. If installation is

performed with less field piping, the system will be overcharged
(abnormal HP, etc.). If the distance between indoor and outdoor unit
is less than 7.5 m, please make sure that the piping length is 

 7.5 m

by additional bending of the pipes.

P

RECAUTIONS

 

ON

 

REFRIGERANT

 

PIPING

When a heat pump outdoor unit is installed below the indoor unit, the
following can occur:

when the unit stops, oil will return to the discharge side of the
compressor. When starting the unit, this can cause liquid (oil)
hammer.

the oil circulation will decrease

To solve these phenomena, provide oil traps in the gas pipe every
15 m if the level difference (H) is more than 15 m. 

(See figure 5)

For R407C units:

Operating stop valve: see 

figure 6

To open:

1

Remove the cap (1) and turn the shaft (2) counterclockwise with
hexagon socket screw keys.

2

Turn it all the way until the shaft stops.

3

Tighten the cap firmly.

To close:

1

Remove the cap and turn the shaft clockwise.

2

Tighten the shaft firmly until it reaches the sealed area (4) of the
body.

3

Tighten the cap firmly.

Precautions for connecting pipes

When the outdoor unit is installed above the indoor unit the following
can occur:

1

The condensated water on the stop valve can move to the
indoor unit. To avoid this, please cover the stop valve with
sealing material.

2

If the temperature is higher than 30°C and the humidity is higher
than RH 80%, then the thickness of the sealing materials should
be at least 20 mm in order to avoid condensation on the surface
of the sealing.

Please refer to the table for the dimensions for processing flares
and for the tightening torques. (Too much tightening will end up
in splitting of the flare.)

When connecting the flare nut, coat the flare both inside and
outside with refrigerant oil (R22), ether or ester oil (R407C) and
initially tighten by hand before tightening firmly.

Make sure to flow nitrogen gas through the pipe when brazing.

Take measures against contamination when installing pipes.
Prevent foreign materials like moisture and other impurities from
mixing into the system.

Great caution is needed when passing copper tubes through walls.

A

outdoor unit

B

indoor unit

C

gas pipe

D

liquid pipe

E

oil trap

NOTE

If the outdoor unit is installed above the indoor unit, oil
traps are not necessary.

Use R407C only when adding refrigerant

Installation tools:

Make sure to use installation tools (gauge manifold charge
hose, etc.) that are exclusively used for R407C
installations to withstand the pressure and to prevent
foreign materials (e.g. mineral oils and moisture) from
mixing into the system. Vacuum pump (use a 2-stage
vacuum pump with a non-return valve):

Make sure the pump oil does not flow oppositely into the
system while the pump is not working.

Use a vacuum pump which can evacuate to -100.7 kPa
(5 Torr, -755 mmHg).

NOTE

Refer to the table for stop valve tightening
torques.

Be sure to use both a spanner and a torque
wrench when connecting or disconnecting pipes
to or from the unit.

Use a charging hose with push rod when using
the service port (5).

Check for refrigerant gas leakage after tightening
the cap.

Make sure to keep the valve open during
operation.

Stop valve tightening torques

Type R(Y)(P)71

Type R(Y)(P)100,125

Service port (5)

980~1470 N•cm (100~150 kgf•cm)

Valve cap 

(1)

Liquid pipe

3234~1470 N•cm (100~150 kgf.cm)

Gas pipe

5635~4655 N•cm 
(575~475 kgf.cm)

7546~6174 N•cm 
(630~770 kgf.cm)

Piping 

size

Flare nut 

tightening torque

A dimensions for 

processing 

flares (mm)

Flare shape

Ø 9.5

3270~3990 N•cm 

(333~407 kgf•cm)

12.0~12.4

Ø 12.7

4950~6030 N•cm 

(504~616 kgf•cm)

15.4~15.8

Ø 15.9

6180~7540 N•cm 

(630~770 kgf•cm)

18.6~19.0

Ø 19.1

9720~11860 N•cm 

(989.8~1208 kgf•cm)

22.9~23.3

Place

Installation period

Protection method

Outdoor unit

More than a month

Pinch the pipe

Less than a month

Pinch or tape the pipe

Indoor

Regardless of the 

period

R=0.4~0.8

45

° ±

2

90

°±

0.5

A

Application of refrigerant oil 
(for R407C ether or ester oil should be used)

Summary of Contents for RP100B7T1

Page 1: ...oners English R71B7V1 R71B7W1 R100B7V1 R100B7W1 R125B7W1 RP71B7V1 RP71B7W1 RP71B7T1 RP100B7V1 RP100B7W1 RP100B7T1 RP125B7W1 RP125B7T1 RY71B7V1 RY71B7W1 RY100B7V1 RY100B7W1 RY125B7W1 RYP71B7V1 RYP71B7W...

Page 2: ...timuksia edellytt en ett niit k ytet n ohjeidemme mukaisesti following the provisions of Directives as amended gem den Vorschriften der Direktiven gem nderung conform ment aux stipulations des Directi...

Page 3: ...1250 500 1000 1000 1000 1000 150 150 50 100 150 500 500 500 50 100 150 250 L1 H H L1 L H L H 500 L1 L2 L1 L2 L2 L1 L1 L2 L2 L1 500 750 1000 0 L1 1 2H 1 2H L1 1000 50 100 100 200 L2 H H L2 L2 L1 500 50...

Page 4: ...onal when used as the outdoor unit for the simultaneous operation system Refer to catalogues for details Never operate the unit without the thermistor R3T burning of the compressor may result Be sure...

Page 5: ...locks etc the height of the foundation should be maximum 150 mm 5 If you install the unit on a frame please install a waterproof plate within 150 mm of the underside of the unit in order to prevent th...

Page 6: ...ion system twin see figure 3 triple see figure 4 The pipes between the outdoor unit and the branch L1 should have the same size as the outdoor connections The pipes between the branch and the indoor u...

Page 7: ...nitially tighten by hand before tightening firmly Make sure to flow nitrogen gas through the pipe when brazing Take measures against contamination when installing pipes Prevent foreign materials like...

Page 8: ...of vacuum break and vacuum drying Then after leaving the system in vacuum for 1 hour confirm that the vacuum gauge does not rise Leak test 1 Evacuate the pipes and check vacuum No pressure increase f...

Page 9: ...dedicated power circuit Do not share a common source with other equipment Fix cables so that cables do not make contact with the pipes especially on high pressure side For W1 and T1 models Make sure...

Page 10: ...T1 MODEL PHASE REVERSE CIRCUIT Q1L Q2L THERMO SWITCH M1F M2F Q3E EARTH LEAK DETECTOR R1T THERMISTOR AIR R2T THERMISTOR COIL R3T THERMISTOR DISCHARGE R4C R5C V1 MODEL RESISTOR RC SIGNAL RECEIVER CIRCUI...

Page 11: ...2 R407C 8 6 5 4 2 1 3 9 7 A B 3 3 1 2 4 5 5 1 5 4 A B 2 3 V1 1 50Hz 230V L N N L 3 2 1 3 2 1 P2 P1 3 2 1 P2 P1 3 2 1 P2 P1 W1 3N 50Hz 400V L3 N N L3 L2 L1 L1 L2 T1 3 50Hz 230V L2 L3 L3 L2 L1 L1 l ll l...

Page 12: ...DaikinZandvoordestraat 300 B 8400 Oostende Belgium 4PW10931 1B...

Reviews: