![background image](http://html1.mh-extra.com/html/daikin/rne35lv1/rne35lv1_service-manual_2459873015.webp)
Si011414E
Compressor
Removal Procedure
13
2
Disconnect the
compressor lead wires
and remove the gasket.
3
Remove all sheets of
the putty.
4
5
6
7
Heat up the brazed part
of the discharge side
pipe and disconnect it.
Heat up the brazed part
of the suction side pipe
and disconnect it.
Remove the 3 nuts of
the compressor.
Lift the compressor up
and remove it.
Step
Procedure
Points
Gasket
S (yellow)
C (blue)
R (red)
(R21367)
Putty
(R21369)
Compressor
Brazed part
of discharge
side pipe
Brazed part
of suction
side pipe
Nut
(R21370)