![background image](http://html1.mh-extra.com/html/daikin/rks42gvlt/rks42gvlt_service-manual_4212856012.webp)
Removal of Electrical Box
Si00-875
10
Removal Procedure
8
Disconnect the
connectors of the front
side.
[S20]: electronic expansion
valve coil
[S40]: overload protector
[S80]: four way valve coil
[S90]: thermistors
When reassembling, insert
each clamp into the hole as
below.
9
Disconnect the relay
connector for the
compressor.
10
Release the clamp.
11
Release the clamp by
pliers.
Some models do not have
the clamp.
12
Detach the clamp and
release the thermistor
lead wires from the
hook.
Step
Procedure
Points
(R17137)
[S40] [S20]
[S90]
[S80]
Thermistor ASSY harness
Electronic
expansion
valve coil
harness
Fan
motor
lead wire
(R17138)
(R17139)
(R5277)
(R17140)
Thermistor lead wire
Hook
Fixing position for the
thermistor harness
When reassembling, insert
the clamp into the small
hole.