![background image](http://html.mh-extra.com/html/daikin/rkm71pvma/rkm71pvma_service-manual_2459842010.webp)
Electrical Box
Si001422E
8
Removal Procedure
6
Disconnect the
connector [S90].
[S90]: thermistors
When reassembling, insert
each clamp into the small
holes.
When reassembling, insert
the clamp of the thermistor
ASSY harness into the hole
as below.
7
Pull out the clamp and
release the harness.
8
Disconnect the
connector [S40].
[S40]: overload protector
9
Release the harness
from the hook.
10
Disconnect the
connector [S80].
[S80]: four way valve coil
Cooling only models have no
harness for [S80].
11
Pull out the clamp and
release the harness.
12
Release the thermistor
harness from the hook
on the bottom of the
electrical box.
When reassembling, insert
the clamp into the small
hole.
13
Pull out the clamp.
Step
Procedure
Points
[S90]
Clamp
(R21683)
Thermistor ASSY harness
(R21725)
Electronic expansion
valve coil harness
[S40]
Hook
(R21684)
[S80]
(R21685)
Clamp
Hook
Clamp
(R21686)
Fixing position for the
thermistor harness
(R21726)