![background image](http://html.mh-extra.com/html/daikin/rkm71pvma/rkm71pvma_service-manual_2459842013.webp)
Si001422E
PCB
Removal Procedure
11
2. Remove the main PCB.
1
Remove the screw on
the terminal block for
smart meter.
Cooling only models have no
terminal block for smart
meter.
2
Remove the earth /
ground screw.
3
Remove the screw.
4
Unfasten the hook on
the right and open the
terminal board cover.
5
Pull out all the
terminals.
When reassembling,
connect the connectors as
below.
Cooling only models have no
connector [LA].
[HR1]: reactor (white)
[HR2]: reactor (blue)
The harness for [HR2] has a
ferrite core.
6
Pull out the terminals
[HR1], [HR2] from the
main PCB.
Step
Procedure
Points
Terminal
block for
smart meter
Earth /
ground wire
(R21695)
Hook
(R21696)
(R21697)
1 (black)
L1 (black)
2 (white)
N1 (white)
L2 (brown)
N2 (blue)
LA (black)
LA (white)
3 (red)
(R21698)
[HR1]
[HR2]
(R21699)