1  Gauge manifold
2  Nitrogen
3  Measuring instrument
4  Refrigerant R410A tank (siphon system)
5  Vacuum pump
6  Charge hose
7  High/Low pressure gas pipe stop valve
8  Suction gas pipe stop valve
9  Liquid pipe stop valve
10 Refrigerant charge port
11 Outdoor unit
12  To BS unit (indoor unit)
13  Stop valve
14  Field piping
15 

Gas flow

16 Stop valve service port
A  Valve A
B  Valve B
C  Valve C

 NOTE

• 

The air-tightness test and vacuum drying should be done using the 
service ports of suction gas pipe, high/low pressure gas pipe and 
liquid pipe stop valve. See the [R410A] Label attached to the front 
panel of the outdoor unit for details on the location of the service 

port (see the figure below).

REYQ72T

REYQ96-168T

[R410A] Label

[R410A] Label

•  See 14.3. Method for adding refrigerant on page 28 for details on 

handling the stop valve.

• 

The refrigerant charge port is connected to unit pipe. When 
shipped, the unit contains the refrigerant, so use caution when at-
taching the charge hose.

<Air tight test>

Pressurize the suction gas pipe, high/low pressure gas pipe and liquid 

pipe from the service ports of each stop valve to 550 psi (3.8 MPa) (do 
not pressurize more than 550 psi (3.8 MPa)). If the pressure does not 

drop within 24 hours, the system passes the test.

If there is a pressure drop, check for leaks, make repairs and perform 
the air tight test again.

<Vacuum drying>

Evacuate the system from the suction gas pipe, high/low pressure gas 

pipe and liquid pipe stop valve service ports by using a vacuum pump 
for more than 2 hours and bring the system to 500 microns or less. 
After keeping the system under that condition for more than 1 hour, 
check if the vacuum gauge rises or not. If it rises, the system may 
either contain moisture inside or have leaks.

 NOTE

During the rainy season, moisture might enter the piping .  If 
working during a rainy season and the work takes long enough 
for condensation to form inside the pipes, take the following 
precautions:

After evacuating the system for 2 hours, pressurize the system to 

7.25 psi (0.05 MPa) (vacuum break) with nitrogen gas and evacuate 

the system again using the vacuum pump for 1 hour to 500 microns or 
less (vacuum drying).

If the system cannot be evacuated to 500 microns within 2 hours, 

repeat the operation of vacuum break and vacuum drying.

Then, after leaving the system in a vacuum for 1 hour, confirm that the 

vacuum gauge does not rise.

11 .  Pipe insulation

• 

Insulation of pipes should be done after performing 10. Air tight test 

and vacuum drying on page 22.

• 

Always insulate the suction gas pipe, high/low pressure gas pipe, 
liquid pipe and pipe connections.

• 

Failing to insulate the pipes may cause leaking or burns.
Be sure to use insulation designed for HVAC equipment. 

• 

Reinforce the insulation on the refrigerant piping according to the 
installation environment. Condensation might form on the surface of 
the insulation. Refer to the below.

 

-

Ambient temperature : 86°F (30°C), humidity : 75% to 80% RH : 

minimum thickness : 9/16 in. (15 mm).

 

-

If the ambient temperature exceeds 86°F (30°C) and the humidity 
80% RH, then the minimum thickness is 3/4 in. (20 mm).
See the Engineering Data Book for detail.

• 

If there is a possibility that condensation on the stop valve might 
drip down into the indoor unit through gaps in the insulation and 
piping because the outdoor unit is located higher than the indoor 
unit, this must be prevented by caulking the connections. (Refer to 

the following figure.)

3

4

5

1

6

1

2

1 Insulation material
2 Caulking, etc.
3 Liquid pipe stop valve
4 Suction gas pipe stop 

valve

5 High/Low pressure gas 

pipe stop valve

6 Connection pipe

01_EN_3P362438-3H.indb   23

1/14/2015   10:20:17 AM

Summary of Contents for REYQ120TTJU

Page 1: ...REYQ264TTJU REYQ288TTJU REYQ312TTJU REYQ336TTJU REYQ360TTJU REYQ384TTJU REYQ408TTJU REYQ432TTJU REYQ456TTJU REYQ72TYDN REYQ96TYDN REYQ120TYDN REYQ144TYDN REYQ168TYDN REYQ192TYDN REYQ216TYDN REYQ240TYD...

Page 2: ...ING Only qualified personnel must carry out the installation work Installation must be done in accordance with this installation manual Improper installation could result in water leakage electric sho...

Page 3: ...away from fluorescent lamps as much as possible Indoor units are for indoor installation only Outdoor units can be installed either outdoors or indoors This unit is for indoor use Do not install the a...

Page 4: ...ize 9 7 4 Selection of refrigerant branch kits 10 7 5 System piping length limitations 11 8 Precautions on refrigerant piping 14 8 1 Caution for brazing 14 8 2 Connecting the refrigerant piping 14 8 3...

Page 5: ...1 REYQ120TTJU TYDN 1 REYQ144TTJU TYDN 1 72 96 120 144 168 REYQ168TTJU TYDN 1 REYQ192TTJU TYDN 1 1 REYQ216TTJU TYDN 1 1 REYQ240TTJU TYDN 1 1 REYQ264TTJU TYDN 1 1 REYQ288TTJU TYDN 2 REYQ312TTJU TYDN 1...

Page 6: ...accessories is shown in the figure below Accessories assy piping Accessories assy operation and installation manual NOTE Do not throw away any of the accessories until installation is complete They ar...

Page 7: ...e reasonable protection against such interference However there is no guarantee that inter ference will not occur in a particular installation It is therefore recommended to install the equipment and...

Page 8: ...nopy 2 Construct a pedestal NOTE When operating the unit in a low outdoor ambient temperature with high humidity conditions make sure to take precautions to keep the drainholes of the unit free by usi...

Page 9: ...a Front side Suction side b h2 2 or more Service space h1 2 or more h1 b a 59 in 1500 mm b 19 5 8 in 500 mm In case of an installation site where sides A B C D have obsta cles the wall heights of sid...

Page 10: ...y attention to the position of the unit s center of gravity NOTE Use a belt sling of 3 4 in 20 mm wide that adequately bears the weight of the unit A forklift can only be used for transport as long as...

Page 11: ...0 mm above the foundation surface A A 13 16 in 20 mm NOTE There are restrictions on the refrigerant pipe connecting order between outdoor unit in the case of the multi system See 1 2 2 Outdoor unit co...

Page 12: ...r other contamination Foreign materials inside pipes including oils for fabrication must be 0 14 gr 10 ft 30 mg 10 m or less Use the following items for the refrigerant piping Material Jointless phosp...

Page 13: ...e on page 9 When using REFNET joints at the first branch from the outdoor unit choose from the following table in accordance with the capacity of the outdoor unit example REFNET joint a see 7 3 Select...

Page 14: ...i connection piping kit must always be installed horizontally paying attention to the installation restrictions indicated in 8 Precautions on refrigerant piping Example of connection 8 indoor units ar...

Page 15: ...t 40 m From indoor unit to indoor unit Height difference From outdoor unit to outdoor unit Height difference Height difference between outdoor units H3 16 ft 5 m Allowable length after branch 3 Actual...

Page 16: ...8 A G p Indoor unit 1 8 j k BS BS BS BS BS BS BS 2 s r q b c d e f g p 130 ft 40 m From outdoor unit to the farthest indoor unit 9 From outdoor unit to the nearest indoor unit 1 2 The total piping len...

Page 17: ...gh with Dry Nitrogen prevents the creation of large quantities of oxidized film on the inside of the piping An oxidized film ad versely affects valves and compressors in the refrigerating system and p...

Page 18: ...cting with the burner flame Liquid pipe stop valve Suction gas pipe stop value Protective plate Stop valve mounting plate High Low pressure gas pipe stop valve 5 Cut off the lower part of the smaller...

Page 19: ...ions to the branch kits are the responsibility of the installer field piping 8 2 4 Precautions when connecting piping between outdoor units multiple outdoor unit system To connect the piping between o...

Page 20: ...branches either horizontally or vertically Mount the REFNET header so that it branches horizontally 2 Installation of the multi connection piping kit A 1 B 1 C D 15 C 4 3 4 in 120 mm D 19 11 16 in 50...

Page 21: ...installed by a licensed elec trician and must comply with relevant local and national regulations Be sure to use a dedicated power circuit Never use a power supply shared by another appliance Never in...

Page 22: ...61 9A 61 9A 43 0A 43 0A 43 0A 38 0A 43 0A 61 9A 38 0A 55 0A 61 9A 55 0A 55 0A 55 0A 55 0A 55 0A 61 9A 15 2A 21 1A 21 1A 31 9A 36 1A 15 2A 21 1A 21 1A 21 1A 21 1A 31 9A 21 1A 31 9A 31 9A 31 9A 31 9A 3...

Page 23: ...11 BS unit 12 Indoor unit 13 Indoor unit Cooling only The Outdoor unit that connect the transmission wiring to BS unit is Master unit of the multi system And the other units are Sub unit In this figur...

Page 24: ...230 V 60 Hz 2 Branch switch Overcurrent breaker 3 Ground wire 4 Control box 5 Only REYQ TYDN Control box 2 6 Only REYQ TYDN Do not open the control box 2 cover There are no work when installation 7 At...

Page 25: ...connect it using a conduit Choose an appropriate knockout hole for conduit size suitable for the power and ground line to be used Transmission line Connect it using a conduit in the knockout hole on t...

Page 26: ...uge rises or not If it rises the system may either contain moisture inside or have leaks NOTE During the rainy season moisture might enter the piping If working during a rainy season and the work take...

Page 27: ...To access you can remove the front inspection door of the front panel see figure Now you can open the inspection door of the control box front panel see figure You can see 3 push buttons and 3 seven s...

Page 28: ...situation is the amount of indoor units which are con nected to the system Result mode 1 setting 10 is addressed and selected return value is monitored information To leave the monitoring function pus...

Page 29: ...efriger ant charge In case recharge is required refer to the nameplate of the unit It states the type of refrigerant and necessary amount 14 2 Calculating the additional refrigerant charge NOTE The re...

Page 30: ...REYQ120TTJU BS units BS4Q54T 1 BSQ60T 1 BSQ96T 1 Indoor units FXMQ type 18 1 24 2 36 1 54 1 FXFQ type 36 2 Other 48 1 Liquid piping a f3 4 60 ft e f1 4 15 ft i f3 8 20 ft m f3 8 20 ft r f1 2 10 ft b f...

Page 31: ...r refrigerant to reach R Q Step 4b Close valve B R Q Step 5 Open all outdoor unit stop valves Step 6 Proceed with automatic or manual charge A Automatic charge B Manual charge Step 6a Push BS2 once 88...

Page 32: ...des appear E 2 indoor temperature out of range and E 3 outdoor temperature out of range In this case perform automatic charging procedure again See figure Location of valves next page for more informa...

Page 33: ...ns to be taken see 14 3 1 Flow chart on page 28 To speed up the process of pre charging refrigerant for large systems it is recommended to first charge a portion of the refrigerant before performing a...

Page 34: ...he unit indicates E 2 or E 3 the ambient conditions are NOT favorable to execute the test run Push BS1 to finish the automatic charging procedure INFORMATION In case a malfunction code occurred during...

Page 35: ...ing for each outdoor unit and calculate the average subcooling of the outdoor unit Systems should have a subcooling of 11 3 F 6 2 C a If average subcooling is low add charge to raise subcooling to 11...

Page 36: ...nominal operating conditions Low noise operation can be set in mode 2 There are two methods to activate low noise operation of the outdoor unit system The first method is to enable an automatic low n...

Page 37: ...onsumption limitation conditions when an external signal is sent to the unit this setting should be changed This setting will only be effective when the optional external control adaptor DTA104A61 62...

Page 38: ...efines the level power consumption limitation that will be applied continuously The level is according to the table Default value 0 OFF Value 2 32 Restriction reference 0 Function not active default 1...

Page 39: ...ing is used in conjunction with setting 2 9 For more information and advice about the impact of these settings see 15 3 Energy saving and optimum operation 15 3 Energy saving and optimum operation Thi...

Page 40: ...ion or undershoot during cooling operation is allowed compared to the requested refrigerant tem perature in order to achieve the required room temperature very fast The overshoot is allowed from the s...

Page 41: ...erature evolution A B C D E F A Indoor unit set temperature B Operation start C Operating time D Mild E Quick F Powerful Example Automatic mode during cooling A B 100 70 E Tc C D 120 F 49 C F 115 F 46...

Page 42: ...sts stand by periods etc INFORMATION Note that during the first running period of the unit required power in put may be higher This phenomenon originates from the compressor that requires a 50 hour ru...

Page 43: ...ting the abnormality press BS3 to reset the malfunction code and retry operation The malfunction code which is displayed on the outdoor unit will indi cate a main malfunction code and a sub code The s...

Page 44: ...r malfunction R14T A1P X19A Check connection on printed circuit board or actuator J5 01 03 05 Temperature sensor malfunction R12T A8P X15A Check connection on printed circuit board or actuator 18 19 2...

Page 45: ...V1 voltage power shortage or open phase Check if power supply is within range Correct phase order 02 09 12 INV1 reversed or open power supply phase Check if power supply is within range Correct phase...

Page 46: ...3P362438 3H EM14A006B 1502 HT...