Cautions for flare connection

Please refer to the table for the dimensions for processing flares
and for the tightening torques. (Too much tightening will end up
in splitting of the flare.)

When connecting the flare nut, coat the flare inner surface with
ether oil or ester oil and initially tighten 3 or 4 turns by hand
before tightening firmly.

After completing the installation, carry out a gas leak inspection
of the piping connections with nitrogen and such.

Cautions for necessity of a trap

Since there is fear of the oil held inside the riser piping flowing back into
the compressor when stopped and causing liquid compression
phenomenon, or cases of deterioration of oil return, it will be necessary
to provide a trap at an appropriate place in the riser gas piping.

Trap installation spacing. 

(See figure 3)

A trap is not necessary when the outdoor unit is installed in a
higher position than the indoor unit.

Cautions for brazing

Be sure to carry out a nitrogen blow when brazing.
Brazing without carrying out nitrogen replacement or releasing
nitrogen into the piping will create large quantities of oxidized
film on the inside of the pipes, adversely affecting valves and
compressors in the refrigerating system and preventing normal
operation.

When brazing while inserting nitrogen into the piping, nitrogen
must be set to 0.02 MPa with a pressure-reducing valve (=just
enough so that it can be felt on the skin). 

(See figure 6)

E

VACUATING

Do not purge the air with refrigerants. Use a vacuum pump to
vacuum the installation. No additional refrigerant is provided for
air purging.

Pipes inside the units were checked for leaks by the
manufacturer. The refrigerant pipes fit on site are to be checked
for leaks by the installer.

Confirm that the valves are firmly closed before leak test or
vacuuming.

Set up for vacuuming and leak test: 

(See figure 5)

Procedure for leak test

Leak test must satisfy EN378-2. 

C

HARGING

 

REFRIGERANT

Important information regarding the refrigerant used

This product contains fluorinated greenhouse gases covered by the
Kyoto Protocol. Do not vent gases into the atmosphere.

Refrigerant type:

R410A

GWP

(1)

 value:

1975

(1)

 GWP = global warming potential

Please fill in with indelible ink,

 the factory refrigerant charge of the product,

 the additional refrigerant amount charged in the field and

+

➁ 

the total refrigerant charge

on the fluorinated greenhouse gases label supplied with the product.

Piping 

size

Flare nut 

tightening torque

A dimensions 

for processing 

flares (mm)

Flare shape

Ø9,5

33~39 N•m

12,8~13,2

Ø15,9

63~75 N•m

19,3~19,7

Ø19,1

98~110 N•m

23,6~24,0

A

Outdoor unit

B

Indoor unit

C

Gas piping

D

Liquid piping

E

Oiltrap

H

Install trap at each difference in height of 15 m.

1

Refrigerant piping

2

Part to be brazed

3

Taping

4

Hands valve

5

Pressure-reducing valve

6

Nitrogen

R=0.4~0.8

45

° ±

2

90

°±

2

A

1

Pressure gauge

2

Nitrogen

3

Refrigerant

4

Weighing machine

5

Vacuum pump

6

Stop valve

1

Evacuate the pipes and check vacuum

(1)

. (No pressure increase for 1 

minute.)

(1) Use a 2-stage vacuum pump with a non return valve which can evacuate to 

–100.7 kPa (5 Torr, –755 mm Hg).
Evacuate the system from the liquid and gas pipes by using a vacuum pump for 
more than 2 hours and bring the system to –100.7 kPa. After keeping the system 
under that condition for more than one hour, check if the vacuum gauge rises or 
not. If it rises, the system may either contain moisture inside or have leaks.

2

Break the vacuum with a minimum of 2 bar of nitrogen. (Never pressurize 
more than 4.15 MPa.)

3

Conduct leak test by applying soap water, etc. to the connecting part of 
the pipes.

4

Discharge nitrogen.

5

Evacuate and check vacuum again

(1)

.

6

If vacuum gauge does no longer rise, the stop valves can be opened.

NOTE

Following should be executed if there is a possibility of
moisture remaining in the pipe (if piping work is carried out
during the raining season or over a long period of time,
rainwater may enter the pipe during work).
After evacuating the system for 2 hours, pressurize the
system to 0.05 MPa (vacuum break) with nitrogen gas and
evacuate the system again using the vacuum pump for
1 hour to –100.7 kPa (vacuum drying). If the system
cannot be evacuated to –100.7 kPa within 2 hours, repeat
the operation of vacuum break and vacuum drying. Then
after leaving the system in vacuum for 1 hour, confirm that
the vacuum gauge does not rise.

After air purging with a vacuum pump it may happen that
the refrigerant pressure does not rise, not even if the stop
valve is opened. Reason for this phenomenon is the closed
state of for instance the expansion valve in the outdoor unit
circuit, but this is not a problem for running the unit.

Summary of Contents for REQ71B8V3B

Page 1: ...INSTALLATION MANUAL REQ71B8V3B REQ71B2V3B REQ100B8V3B REQ71B8W1B REQ71B2W1B REQ100B8W1B REQ125B8W1B Split System air conditioners...

Page 2: ...4 5 6 6 3 1 2 3 4 5 A B A E B C D H H1 L1 A A B2 B2 B2 C C D1 D1 D1 D2 D2 D2 D2 D2 E E H H L1 L1 L1 L2 L2 L2 A A B1 B1 B1 B1 B1 B1 B2 B2 B2 C C D1 D1 D1 D2 D2 D2 D2 D2 E E H H L1 L1 L1 L2 L2 L2 1 1 2...

Page 3: ...hold til bestemmelsene i 13 noudattaen m r yksi 14 za dodr en ustanoven p edpisu 15 prema odredbama 16 k veti a z 17 zgodnie z postanowieniami Dyrektyw 18 n urma prevederilor 19 ob upo tevanju dolo b...

Page 4: ...cuit Insufficient capacity of the power supply circuit or improper electrical construction may lead to electric shocks or fire Make sure that all wiring is secure using the specified wires and ensurin...

Page 5: ...thinner or gasoline are handled Such gases may cause a fire Where the air contains high levels of salt such as that near the ocean Where voltage fluctuates a lot such as that in factories In vehicles...

Page 6: ...ease install a waterproof plate within 150 mm of the underside of the unit in order to prevent the invasion of water from the lower direction 6 When installing the unit in a place frequently exposed t...

Page 7: ...omply with relevant local and national regulations The minimal pipe thickness for R410A piping must be in accordance with the table below O Annealed 1 2H Half hard Suction side obstacle Obstacle is pr...

Page 8: ...rd If oil color is identical to the circled color or darker replace the piping install new piping or clean the piping thoroughly If oil color is lighter the pipes can be reused without cleaning An oil...

Page 9: ...erly Check for refrigerant leakage after tightening the cap Cautions for handling service port After the work tighten the valve cover in place Tightening torque 10 8 14 7 N m Precautions when connecti...

Page 10: ...arming potential Please fill in with indelible ink the factory refrigerant charge of the product the additional refrigerant amount charged in the field and the total refrigerant charge on the fluorina...

Page 11: ...ulations NOTE Piping length is the 1 way length gas or liquid Connected piping length is between Class 7 5 30 m 30 40 m 40 50 m 71 0 20 0 70 1 20 100 125 0 10 0 60 1 10 NOTE In case of complete rechar...

Page 12: ...not use a wire conduit be sure to protect the wires with vinyl tubes to prevent the edge of the knock out hole from cutting the wires Follow the electric wiring diagram for electrical wiring works For...

Page 13: ...in case of W1 units E0 or E6 will be displayed on the remote controller of the indoor unit Operation will be impossible with either one of these phenomena If this happens turn off the power re check...

Page 14: ...A Q1M Q2M Thermo switch M1F M2F Q1RP Phase reverse circuit R1T Thermistor air R2T Thermistor coil R3T Thermistor discharge RC Signal receiver circuit S1PH Pressure switch HIGH S1PL Pressure switch LOW...

Page 15: ...NOTES NOTES...

Page 16: ...4PW23690 1C Copyright Daikin...

Reviews: