![background image](http://html1.mh-extra.com/html/daikin/r100luy1/r100luy1_service-manual_2460286005.webp)
Si241312
Procedure to Remove Switch Box
Removal Procedure
3
2. Procedure to Remove Switch Box
Procedure
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure
Points
Removing top panel and
front panel according to
the “Procedure to
Remove Outside Panels”.
1
Spread the lower parts
of hooks (3 locations) to
remove the resin cover.
2
Remove following
connectors, fastening
terminal from
compressor terminals
and thermistors
according to “Removal
of Thermistor”.
X14A, X15A, X11A,
X12A, X22A, X10A,
X25A
3
Dismount 2 screws (
∗
)
fixing the switch box.
4
To remove the switch
box, pull the box
frontward before slide
the left side upward.
Resin cover
Fixing screws (
∗
)
Hooking parts
Switch box
Hooks
(3 locations)