35
Step 3: Fasten the units to the ground (optional)
After positioning the units, make sure they are perfectly level, if necessary inserting suitable solid and sta-
ble shims under the supports.
Finish by fastening them to the ground (tools and fastening components not included). The installer is re-
sponsible for choosing the most suitable means of fastening based on experience (the drawing includes
an example).
There is no need to insert vibration damping material between the machine and the ground as
the moving internal parts transmit no residual vibrations to the outside.
8
Example of floor mounting using steel brackets (not supplied)
Summary of Contents for Modular Rotary
Page 15: ...15 Notes...
Page 28: ...28 Notes...
Page 33: ...33 VDI 6022 6...
Page 34: ...34 1 x TE8x35 1 x 8 5 1 x M8 2 x TE8x35 2 x 8 5 2 x M8 7...
Page 43: ...43 3 4 5 x 1 100mm 100mm 250mm 250mm 250mm 10 100mm 5mm...
Page 44: ...44 6 7 NO OK...
Page 45: ...45 H2O SOAP 8...
Page 46: ...46 9...
Page 47: ...47 Notes...
Page 62: ...62 Repair log DATE SERVICE TYPE TIME REQUIRED SIGNATURE...