![Daikin LRLEQ5AY1(E) Service Manual Download Page 70](http://html1.mh-extra.com/html/daikin/lrleq5ay1-e/lrleq5ay1-e_service-manual_3283876070.webp)
SiENBE28-901
Test Operation
Air Cooled Refrigeration Condensing Unit
69
5.4
Checks after Work Completion
Make sure the following works are complete in accordance with the installation manual.
• Piping work
• Wiring work
• Air tight test/Vacuum drying
• Installation work for indoor unit
5.5
Additional Refrigerant Charge
For refrigerant filling contractor
Use R410A for refrigerant replenishment.
The R410A refrigerant cylinder is painted with a pink belt.
Warning
Electric Shock Warning
Securely close the control box lid before turning power on.
Before turning power on, check through the inspection hole (on the left-hand side) of the
control box lid that the RUN switch is set to OFF.
If the RUN switch is set to ON, the fan may rotate.
Check the LED indicators on the PCB (A1P) of the outdoor unit through the inspection hole
(on the right-hand side) of the control box lid after the outdoor unit is turned on (see the
illustration).
(The compressor will not operate for approximately 2 minutes after the outdoor unit is turned
on.
H2P blinks for the first five seconds when the power supply is turned on. If the equipment is
normal, H2P will be turned off in five seconds. H2P lights for abnormality.)
Warning
Use protective gear (e.g., protective gloves and glasses) at the time of refrigerant filling.
Pay attention to the rotation of the fan whenever the front panel is opened while working.
The fan can rotate continuously for a while after the outdoor unit stops operating.
Inspection hole (right-hand side)
(upper right-hand side of control box)
Control box lid
Lift up this tab and
open the cover.
LED
(H1~8P)
Inspection
hole cover
Inspection hole
(right-hand side)
RUN switch
(factory set: OFF)
Inspection hole
(left-hand side)
Control box
Inspection hole (left-hand side)
(upper left-hand side of control box)
REMOTE
OFF
ON