9 Technical data
Installation and operation manual
29
LRMEQ+4BY1
Air-cooled refrigeration condensing unit
4P545024-1 – 2018.09
9
Technical data
A
subset
of the latest technical data is available on the regional Daikin website (publicly accessible). The
full set
of latest technical data is
available on the Daikin extranet (authentication required).
9.1
Service space: Outdoor unit
When mounting units side by side, the piping route must be to the front, to the back or downwards. In this case the piping route to the side is
not possible.
When mounting the units side by side and routing the piping to the back, you must keep a distance of ≥250 mm between the units (instead of
≥100 mm as shown on the figures below).
Single unit (
) | Single row of units (
)
See figure 1 on the inside of the front cover.
A,B,C,D
Obstacles (walls/baffle plates)
E
Obstacle (roof)
a,b,c,d,e
Minimum service space between the unit and obstacles A, B, C, D and E
e
B
Maximum distance between the unit and the edge of obstacle E, in the direction of obstacle B
e
D
Maximum distance between the unit and the edge of obstacle E, in the direction of obstacle D
H
U
Height of the unit
H
B
,H
D
Height of obstacles B and D
1
Seal the bottom of the installation frame to prevent discharged air from flowing back to the suction side through the bottom of the unit.
2
Maximum two units can be installed.
Not allowed
Multiple rows of units (
)
See figure 2 on the inside of the front cover.
Stacked units (max. 2 levels) (
)
See figure 3 on the inside of the front cover.
A1=>A2
(A1) If there is danger of drainage dripping and freezing between the upper and lower units…
(A2) Then install a
roof
between the upper and lower units. Install the upper unit high enough above the lower unit to prevent ice buildup at the
upper unit's bottom plate.
B1=>B2
(B1) If there is no danger of drainage dripping and freezing between the upper and lower units…
(B2) Then it is not required to install a roof, but
seal the gap
between the upper and lower units to prevent discharged air from flowing back to the
suction side through the bottom of the unit.
9.2
Piping diagram: Outdoor unit
R4T
R1T
R2T
R6T
R3T
Y1E
S1NPL
3D111393B
S1PH
R5T
S1NPH
M1C
M
a
c
d
b
c
c
d
n
k
l
e
j
f
i
m
h
g
f
a
Stop valve (gas)
b
Stop valve (liquid)
c
Filter
d
Service port
e
Check valve
f
Maintenance stop valve
g
Liquid receiver
h
Heat exchanger
i
Oil separator
j
Distributor
k
Double tube heat exchanger
l
Propeller fan
m
Sight glass
n
Capillary tube
M1C
Compressor
R1T
Thermistor (air)
R2T
Thermistor (discharge)
R3T
Thermistor (suction)
R4T
Thermistor (Liquid pipe)
R5T
Thermistor (Subcool heat exchanger outlet)
R6T
Thermistor (Subcool heat exchanger inlet)
S1NPH
High pressure sensor
S1NPL
Low pressure sensor
S1PH
High pressure switch
Y1E
Electronic expansion valve (Subcooling)
9.3
Wiring diagram: Outdoor unit
The wiring diagram is delivered with the unit, located at the inside of
the service cover.
Symbols:
English
Translation
Symbols
Symbols
X1M
Main terminal
Earth wiring
15
Wire number 15
Field wire
Field cable
Summary of Contents for LRLEQ3BY1
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ...4P545024 1 2018 09 Copyright 2016 Daikin 4P441336 1 0000000J 4P545024 1 0000000I...