![background image](http://html.mh-extra.com/html/daikin/im-1193/im-1193_installation-and-maintenance-data_2460231005.webp)
IM 1193 / Page 5 of 32
Unit Dimensions
Note:
Electrical rough-in should be located behind kickplate (removable front) and below wall sleeve.
Table 1: Cabinet & wall sleeve dimensions
1¼" Recess for Architectural Louver
"A"
Room Cabinet
"D"
Wall Sleeve
"B"
Wall
Thickness
18¾"
13¾"
4¾–5¾"
17¾"
13¾"
5¾–6¾"
16¾"
13¾"
6¾–7¾"
15¾"
13¾"
7¾–8¾"
14¾"
13¾"
8¾–9¾"
13¾"
13¾"
9¾–10¾"
12¾"
13¾"
10¾–11¾"
11¾"
13¾"
11¾–12¾"
10¾"
13¾"
12¾–13¾"
10¾"
14¾"
13¾–14¾"
10¾"
15¾"
14¾–15¾"
10¾"
16¾"
15¾–16¾"
10¾"
17¾"
16¾–17¾"
Standard Size Wall Sleeve
Figure 1: PGAN 16" x 42" with top-mounted hydronic heat
Removable Front Panel
Digital Touchpad Control
16" x 42" Wall Sleeve
Louver (Architectural)
Top-Mount Hydronic Heat Section
Cooling Chassis
Room Cabinet