![background image](http://html.mh-extra.com/html/daikin/fxaq-pvju/fxaq-pvju_engineeiring-data_2459646034.webp)
EDUS391100-F6
Installation
FXAQ-PVJU
33
SPECIFICATIONS FOR FIELD SUPPLIED FUSES AND WIRE
Model
Power supply wiring
Remote controller wiring
Transmission wiring
Field fuses
Size
Wire
Size
FXAQ07PVJU
15A
Size must
comply with
local codes.
CONDUCTOR
STRANDED
AWG18-16
FXAQ09PVJU
FXAQ12PVJU
FXAQ18PVJU
NONSHIELDED
FXAQ24PVJU
Allowable length of transmission wiring and remote controller wiring are as follows.
•
(1) Outdoor unit - Indoor unit: Max. 3280ft. (Total wiring length: 6560ft.)
(2) Indoor unit - Remote controller: Max. 1640ft.
Insulated thickness: 1/16” or more
•
WIRING EXAMPLE AND HOW TO SET THE REMOTE CONTROLLER
HOW TO CONNECT WIRINGS
Conduit for power supply wiring
•
Unscrew and remove the conduit mounting plate from the control box.
(Refer to Fig. 20)
Fix a conduit to the plate with a lock nut and reattach them at original position.
Control box
Refrigerant piping
Conduit
Lock nut
Conduit mounting plate
Screw
Fig. 20
<Back side>
<Front side>
Power supply wiring and ground wiring
•
Unscrew and remove the control box cover.
Thread the power supply wiring and ground wiring through the included insulating tube (short) (7) and
secure them with the included clamp (small) (5).
(Refer to Fig. 21)
Connect the power supply wiring and ground wiring to the power supply terminal block (3P).
When doing this, fi rmly secure using the included clamp (small) (5) according to the fi gure.
(Refer to Fig. 22)