CAUTION
After test operation is completed, check the items mentioned in the clause 2 “
2. Items to be checked at
delivery
” on page 4.
If the interior finish work is not completed when the test operation is finished, for protection of the air con-
ditioner, ask the customer not operate the air conditioner until the interior finish work is completed.
If the air conditioner is operated, the inside of the indoor units may be polluted by substances generated
from the coating and adhesives used for the interior finish work and cause water splash and leakage.
To the operator carrying out test operation
After test operation is completed, before delivering the air conditioner to the customer, confirm that the
control box lid is closed.
In addition, explain the power supply status (power supply ON/OFF) to the customer.
12. WIRING DIAGRAM
(Refer to Fig. 51)
1
IN CASE OF SIMULTANEOUS OPERA-
TION SYSTEM (NOTE 5)
2
INDOOR UNIT (MASTER)
3
INDOOR UNIT (SLAVE)
4
REMOTE CONTROLLER
5
CONTROL BOX
6
TO OUTDOOR UNIT (NOTE 3)
7
(NOTE 8)
8
INDOOR UNIT
9
WIRELESS REMOTE CONTROLLER
(RECEIVER/DISPLAY UNIT)
(OPTIONAL ACCESSORY)
10
CENTRAL REMOTE CONTROLLER
(NOTE 4)
11
WIRED REMOTE CONTROLLER
(OPTIONAL ACCESSORY) (NOTE 6)
12
TO OUTDOOR UNIT
01_EN_3P177351-6P.fm Page 38 Sunday, September 30, 2012 1:52 PM