![background image](http://html1.mh-extra.com/html/daikin/ftxp20m5v1b9/ftxp20m5v1b9_user-reference-manual_2459488015.webp)
4
|
Before operation
User Reference Guide
15
FTXP20~35M5V1B9
Daikin room air conditioners
4D520466-7C – 2020.03
4 Before operation
4.1 Overview: Before operation
This chapter describes what you have to do before operating the unit.
Typical workflow
Before operation usually consist of the following stages:
▪
Inserting the batteries in the user interface.
▪
Fixing the user interface to the wall.
▪
Turning on the power supply.
4.2 To insert the batteries
The batteries will last for about 1 year.
1
Remove the back cover.
2
Insert both batteries at once.
3
Put the cover back.
2
3
1
AAA.LR03
2
3
1
AAA.LR03
4.3 To fix the user interface to the wall
c
b
a
2×
a
User interface
b
Screws (field supply)
c
User interface holder