4
|
Before operation
User reference guide
15
FTXF50~7 FTXF50~71A2V1B
Daikin room air conditioner
4P513685-9E – 2021.07
4 Before operation
4.1 Overview: Before operation
This chapter describes what you have to do before operating the unit.
Typical workflow
Before operation usually consist of the following stages:
▪
Inserting the batteries in the user interface.
▪
Fixing the user interface to the wall.
▪
Turning on the power supply.
4.2 To insert the batteries
The batteries will last for about 1 year.
1
Remove the back cover.
2
Insert both batteries at once.
3
Put the cover back.
2
3
1
AAA.LR03
4.3 To mount the user interface holder
2×
b
c
a
a
User interface
b
Screws (field supply)
c
User interface holder
1
Choose a place where the signals reach the unit.
2
Attach the holder with screws to the wall or a similar location.
3
Hang the user interface on the user interface holder.