VACUUMING AND CHARGING
Vacuuming is necessary to eliminate all moisture and air from the system.
Vacuuming The Piping And The Indoor Unit
Except for the outdoor unit which is pre-charged with
refrigerant, the indoor unit and the refrigerant connection
pipes must be air-purged because the air containing moisture
that remains in the refrigerant cycle may cause malfunction
of the compressor.
Remove the caps from the valve and the service port.
Connect the center of the charging gauge to the vacuum
pump.
Connect the charging gauge to the service port of the 3-way
valve.
Start the vacuum pump. Evacuate for approximately 30
minutes. The evacuation time varies with different vacuum
pump capacity. Confirm that the charging gauge needle has
moved towards -760mmHg.
Caution
If the gauge needle does not move to -760mmHg, be sure
to check for leakage at flare type connection of the indoor
and outdoor unit and repair the leak before proceeding to
the next step.
Close the valve of the changing gauge and stop the vacuum
pump.
On the outdoor unit, open the suction valve (3 way) and
liquid valve (2 way) (in anti-clockwise direction) with 4mm
key for hexagon sacked screw.
Charge Operation
This operation must be done by using a gas cylinder and a
precise weighing machine. The additional charge is topped-up
into the outdoor unit using the suction valve via the service
port.
Remove the service port cap.
Connect the low pressure side of the charging gauge to the
suction service port center of the cylinder tank and close
the high pressure side of the gauge. Purge the air from the
service hose.
Start the air conditioner unit.
Open the gas cylinder and low pressure charging valve.
When the required refrigerant quantity is pumped into
the unit, close the low pressure side and the gas cylinder
valve.
Disconnect the service hose from service port. Put back
the service port cap.
•
•
•
•
•
•
•
•
•
•
•
•
•
Refrigerant Piping
Outdoor Unit 3 ways valve
Allen key
Service Port
Flare nut
HIGH PRESSURE GAUGE
GAUGE MANIFOLD
LOW PRESSURE GAUGE
HANDLE
HI
(ALWAYS CLOSED)
CHARGE HOSE
-760mmHg
HANDLE
LO
CHARGE HOSE
VACUUM PUMP
ADAPTER FOR
COUNTER FLOW
PREVENTION
CHECK VALVE
LIQUID VALVE
HIGH PRESSURE GAUGE
LOW PRESSURE GAUGE
GAUGE MANIFOLD
-760mmHg
HANDLE
LO
HANDLE
HI
(ALWAYS CLOSED)
CHARGE HOSE
CHARGE HOSE
CHECK VALVE
LIQUID VALVE
GAS VALVE
(3-WAY)
CONFIGURATION OF AIR
PURGE BY CHARGING
GAS VALVE
(3-WAY)
CONFIGURATION OF AIR
PURGE BY CHARGING
1 IM-3WMYJ(R)-0816(0)-DAIKIN-EN-15 15
1 IM-3WMYJ(R)-0816(0)-DAIKIN-EN-15 15
12/22/16 10:23:29 AM
12/22/16 10:23:29 AM
Summary of Contents for FTXC25AV1B
Page 2: ......
Page 123: ...7 1 XEMA A MEP K FTXC C B A...
Page 126: ...7 4 H MAH E CTOPO HO 1 1 OFF H MAH E Xm2 13...
Page 128: ...2 K a B 25 35 K M4 x 12L e 75 50 500 1200 50 100 50 50 100 150 150 300 50 1200 1 2 3 7 6...
Page 129: ...1 2 30 3 16 50 60 H A B C D 300 1000 300 500 2 A A 7 7 C D pe c pe c A B H 2 H...
Page 130: ...50 50 75 c y ox 7 8...
Page 136: ...7 14 R32 13 25 OFN...
Page 137: ...7 15 C 3 30 760 760mmHg 3 2 4 o 3 760 760 3 3...
Page 140: ...7 18 FRONT K a B 2 1 4 2 5 4 3 K a CTOPO HO 1 3 2 4...
Page 141: ...7 19 2 1 2 c 3 40 104 F 1 2 3 1 2 40 104 F 1 2 1 2 CTOPO HO...
Page 142: ...7 20 3 1 3 4 2 3 4 5 6 2 30 C 86 F CTOPO HO 40 C...
Page 143: ...8 1 FTXC C B A...
Page 146: ...8 4 1 1 ON OFF OFF Xm2 13...
Page 149: ...16mm 50 60 H A B C D mm 300 1000 300 500 2 A 1 2 30mm 3 8 7 C D A B H 2 H...
Page 150: ...50 50 75 mm 8 8...
Page 156: ...R32 LFL 13 25 OFN OFN OFN OFN 8 14...
Page 157: ...8 15 3 30 760mmHg 760 mmHg 3 2 4 mm 3 760 mmHg 760mmHg 3 3...
Page 161: ...8 19 2 1 2 3 40 C 104 F 1 2 3 2 40 C 104 F 1 2 2...
Page 162: ...8 20 3 1 3 4 2 3 4 5 6 2 30 C 86 F 40 C...
Page 163: ...MEMO PROMEMORIA MITTEILUNG EL MEMOR NDUM LE M MO NOT...
Page 167: ......