![background image](http://html1.mh-extra.com/html/daikin/fte09mv2s/fte09mv2s_service-manual_2459325018.webp)
Removal of PCBs
Si041138
16
Removal Procedure
3
4
5
Slide the electrical box
cover to the left and
remove it.
Disconnect the wire
harnesses.
Disconnect the thermal
fuse connector [S5]
after cutting off the
clamp.
5. Remove the signal
receiver PCB.
1
Unfasten the 3 hooks
and remove the signal
receiver PCB.
Step
Procedure
Points
Electrical
box cover
Hook
Hook
(R4358)
(R4359)
[S5]
(R13165)
(R13166)
Signal receiver PCB
Hook
Hook
Hook