![background image](http://html1.mh-extra.com/html/daikin/fte09mv2s/fte09mv2s_service-manual_2459325016.webp)
Removal of PCBs
Si041138
14
Removal Procedure
6. Removal of PCBs
Procedure
Warning
Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure
Points
1. Remove the shield plate.
1
2
3
The figure shows the
appearance of the
electrical box.
Open the shield plate.
Push the upper center
of the shield plate and
unfasten the 2 hooks.
Remove the shield
plate.
Preparation
Remove the electrical box
according to the “Removal of
Electrical Box.”
2. Release the indoor heat
exchanger thermistor.
1
Release the indoor heat
exchanger thermistor
and the earth wire from
the hooks.
(R12736)
Signal receiver unit
Shield plate
Hook
(R13208)
Hook
Hook
(R4352)
Earth wire
Clamp
(R4353)
Indoor heat
exchanger
thermistor