![background image](http://html1.mh-extra.com/html/daikin/ftd20jev1k/ftd20jev1k_installation-manual_2459323006.webp)
4
Air
À
lter
M4 x 12L
Titanium apatite photocatalytic
air-purifying
À
lter (2)
Front panel
30mm or more from ceiling
50mm or more from walls
(on both sides)
Air
À
lter
Titanium apatite photocatalytic
air-purifying
À
lter
Filter frame
Tab
Q
Opening service lid
Service lid is opening/
closing type.
Q
Opening method
1) Remove the service lid
screws.
2) Pull out the service lid
diagonally down in the
direction of the arrow.
3) Pull down.
INSTALLATION DIAGRAM
Indoor unit
Outdoor Unit
Service lid
INSTALLATION OF THE OUTDOOR UNIT
The outdoor unit must be installed in such a way, so as to
prevent short circuit of the hot discharged air or obstruction to
the smooth air flow. Please follow the installation clearances
shown in the figure. Select the coolest possible place where
intake air temperature is not greater than the outside air
temperature (please refer operating range).
Installation clearances
Obstacle
Return air
Service access
Note:
If there is any obstacle higher than 2m, or if there is any
obstruction at the upper part of the unit, please allow more
space than the figure indicated in the above table.
Return air
Dischar
g
e air
C
D
Dimension
A
B
C
D
Minimum Distance,
mm (in)
300
(11.8)
1000
(39.4)
300
(11.8)
500
(19.7)
Obstacle
Obstacle
Obstacle
Wrap the insulation pipe with the
À
nishing tape from bottom to top.
Cut thermal insulation pipe to
an appropriate length and wrap
it with tape, making sure that
no gap is left in the insulation
pipe’s cut line.
Caulk pipe
hole gap
with putty.
A
B
1-EN-IM WMJ-1111(0)Daikin.indd 4
11/29/11 2:04:42 PM