
8
|
Piping installation
Installer reference guide
95
ERLA11~16D + EBVH16SU23D
Daikin Altherma 3 R F
4P655196-1A – 2022.05
a
d
b
c
a
Front
b
Side
c
Rear
d
Bottom
INFORMATION
b
b
b
b
a
a
▪
Remove the knockout hole (a) in the bottom plate or cover plate by tapping on
the attachment points with a flat head screwdriver and a hammer.
▪
Optionally, cut out the slits (b) with a metal saw.
NOTICE
Precautions when making knockout holes:
▪
Avoid damaging the casing and underlying piping.
▪
After making the knockout holes, we recommend to remove the burrs and paint
the edges and areas around the edges using repair paint to prevent rusting.
▪
When passing electrical wiring through the knockout holes, wrap the wiring with
protective tape to prevent damage.
3
Do the following:
▪
Connect the liquid pipe (a) to the liquid stop valve.
▪
Connect the gas pipe (b) to the gas stop valve.
a
b
4
Do the following:
Summary of Contents for ERLA-DV17
Page 310: ...13 13 ...
Page 311: ......
Page 312: ...4P655196 1A 2022 05 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...