D-EIMWC00804-14EN
Centrifugal Chillers
9
Installation
Receiving and Handling
The unit should be inspected immediately after receipt for possible damage.
All Daikin centrifugal water chillers are shipped FOB factory and all claims for handling and
shipping damage are the responsibility of the consignee.
Insulation corners from the evaporator's rigging hole locations are shipped loose and should be
glued in place after the unit is finally placed. Neoprene vibration pads are also shipped loose.
Check that these items have been delivered with the unit.
If so equipped, leave the shipping skid in place until the unit is in its final position. This will
aid in handling the equipment.
Extreme care must be used when rigging the equipment to prevent damage to the control panels
or refrigerant piping. See the certified dimension drawings included in the job submittal for the
center of gravity of the unit. Consult the local Daikin sales office for assistance if the drawings
are not available.
The unit can be lifted by fastening the rigging hooks to the four corners of the unit where the
rigging eyes are located (see Figure 1). Spreader bars must be used between the rigging lines to
prevent damage to the control panels, piping and motor terminal boxes.
Figure 1, DWSC Major Component Locations
Unit Control
Panel
Rigging
Locations
(6) Available
Evaporator
Condenser
Rigging
Locations
(6) Available
Compressor Starter,
Mounting Optional
Compressor Control
Panel, At Rear
Operator Interface
Panel