10 Commissioning

Installation manual

14

FTXP20~3 ATXP20~35N5V1B

Daikin room air conditioner

3P650253-9H – 2022.10

INFORMATION

In  case  you  could  NOT  complete  the  setting  in  time,  turn
the  power  supply  off  and  wait  at  least  1  minute  before
turning the power supply back on.

4

Press simultaneously:

Model

Buttons

FTXP and ATXP

 and 

5

Press:

Model

Buttons

FTXP and ATXP

6

Select:

Model

Symbol

FTXP and ATXP

7

Press:

Model

Button

FTXP and ATXP

ON/OFF

a

b

a

Operation lamp

b

Indoor unit ON/OFF switch

8

Press  the  indoor  unit  ON/OFF  switch  while  the  operation  lamp
is blinking.

Jumper

Address

Factory setting

1

After cutting with nippers

2

INFORMATION

If the setting could NOT be completed while the operation
lamp  was  blinking,  repeat  the  setting  process  from  the
beginning.

9

When the setting is complete, press:

Model

Button

FTXP and ATXP

Keep 

 pressed for about

5 seconds.

Result: 

 The user interface will return to the previous screen.

10

Commissioning

NOTICE

ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.

10.1

Checklist before commissioning

1

After the installation of the unit, check the items listed below.

2

Close the unit.

3

Power up the unit.

You  read  the  complete  installation  instructions,  as
described in the 

installer reference guide

.

The 

indoor units

 are properly mounted.

The 

outdoor unit

 is properly mounted.

Air inlet/outlet

Check  that  the  air  inlet  and  outlet  of  the  unit  is  NOT
obstructed  by  paper  sheets,  cardboard,  or  any  other
material.

There are NO 

missing phases

 or 

reversed phases

.

The 

refrigerant  pipes

  (gas  and  liquid)  are  thermally

insulated.

Drainage

Make sure drainage flows smoothly.

Possible consequence: 

Condensate water might drip.

The  system  is  properly 

earthed

  and  the  earth  terminals

are tightened.

The 

fuses

  or  locally  installed  protection  devices  are

installed according to this document, and have NOT been
bypassed.

The 

power  supply  voltage

  matches  the  voltage  on  the

identification label of the unit.

The  specified  wires  are  used  for  the 

interconnection

cable

.

The indoor unit receives the signals of the 

user interface

.

There  are  NO 

loose  connections

  or  damaged  electrical

components in the switch box.

The 

insulation resistance

 of the compressor is OK.

There  are  NO 

damaged  components

  or 

squeezed

pipes

 on the inside of the indoor and outdoor units.

There are NO 

refrigerant leaks

.

The  correct  pipe  size  is  installed  and  the 

pipes

  are

properly insulated.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

10.2

To perform a test run

Prerequisite: 

Power supply MUST be in the specified range.

Prerequisite: 

Test  run  may  be  performed  in  cooling  or  heating

mode.

Prerequisite: 

Test run should be performed in accordance with the

operation  manual  of  the  indoor  unit  to  make  sure  that  all  functions
and parts are working properly.

1

In  cooling  mode,  select  the  lowest  programmable  temperature.
In heating mode, select the highest programmable temperature.
Test run can be disabled if necessary.

2

When  the  test  run  is  finished,  set  the  temperature  to  a  normal
level. In cooling mode: 26~28°C, in heating mode: 20~24°C.

3

The  system  stops  operating  3  minutes  after  the  unit  is  turned
OFF.

10.2.1

To perform a test run in winter season

When operating the air conditioner in 

Cooling

 mode in winter, set it

to test run operation using the following method.

Summary of Contents for ATXP20N5V1B

Page 1: ...Installation manual Daikin room air conditioner English Installation manual Daikin room air conditioner FTXP20N5V1B FTXP25N5V1B FTXP35N5V1B ATXP20N5V1B ATXP25N5V1B ATXP35N5V1B...

Page 2: ...s instrukcij atbilst d m direkt v m vai regul m ja vien ie izstr d jumi tiek lietoti saska ar m su instrukcij m s v zhode s nasleduj cou imi smernicou ami alebo predpisom mi za predpokladu e sa v robk...

Page 3: ...7 1206 Radio Equipment Regulations 2017 following the provisions of BS EN 60335 2 40 2003 A13 2012 BS EN IEC 62311 2020 BS EN IEC 55014 1 2021 BS EN IEC 55014 2 2021 BS EN IEC 61000 3 2 2019 A1 2021 B...

Page 4: ...fferent channel of the indoor unit infrared signal receiver 13 10 Commissioning 14 10 1 Checklist before commissioning 14 10 2 To perform a test run 14 10 2 1 To perform a test run in winter season 14...

Page 5: ...ill be sucked in This will cause abnormal pressure in the refrigeration cycle which may result in equipment damage and even injury CAUTION Incomplete flaring may cause refrigerant gas leakage Do NOT r...

Page 6: ...DANGER RISK OF ELECTROCUTION Disconnect the power supply for more than 10 minutes and measure the voltage at the terminals of main circuit capacitors or electrical components before servicing The vol...

Page 7: ...fety precaution 5 1 1 Installation site requirements of the indoor unit INFORMATION The sound pressure level is less than 70 dBA Air flow Make sure nothing blocks the air flow Drainage Make sure conde...

Page 8: ...then mount the front panel 5 2 5 To remove the electrical wiring box cover 1 Remove the front grille 2 Remove 1 screw from the electrical wiring box 3 Open the electrical wiring box cover by pulling t...

Page 9: ...ppers to remove the pipe port cover as this would damage the front grille 5 3 4 To provide drainage Make sure condensation water can be evacuated properly This involves General guidelines Connecting t...

Page 10: ...left side and do not forget to tighten it with the fixing screw otherwise water leakage may occur a b a b a Insulation fixing screw b Drain hose 4 Attach the drain hose to the refrigerant piping bott...

Page 11: ...it using flare connections 2 Insulate the refrigerant piping interconnection cable and drain hose on the indoor unit as follows c a b f d g e a Gas pipe b Gas pipe insulation c Interconnection cable d...

Page 12: ...cable for 220 240 V Recommended field fuse 20 A Earth leakage circuit breaker Must comply with applicable legislation 7 2 To connect the electrical wiring to the indoor unit WARNING Provide adequate m...

Page 13: ...the bottom frame or the front grille 2 Pass the drain hose and refrigerant piping through the wall hole and seal the gap with a putty 8 3 To fix the unit on the mounting plate 1 Set the indoor unit on...

Page 14: ...e refrigerant pipes gas and liquid are thermally insulated Drainage Make sure drainage flows smoothly Possible consequence Condensate water might drip The system is properly earthed and the earth term...

Page 15: ...operation press INFORMATION Some of the functions CANNOT be used in the test run operation mode If a power failure occurs during operation the system automatically restarts immediately after power is...

Page 16: ...AC CN E HA HE HL HN HR MR _A MR _B S U V W X A K R_ NE Connection connector D V D Diode DB Diode bridge DS DIP switch E H Heater FU F U for characteristics refer to PCB inside your unit Fuse FG Conne...

Page 17: ...FTXP20 35N5V1B ATXP20 35N5V1B Daikin room air conditioner 3P650253 9H 2022 10 Symbol Meaning X Terminal X M Terminal strip block Y E Electronic expansion valve coil Y R Y S Reversing solenoid valve c...

Page 18: ......

Page 19: ......

Page 20: ...ANBUL T RK YE Tel 0216 453 27 00 Faks 0216 671 06 00 a r Merkezi 444 999 0 Web www daikin com tr G lsuyu Mahallesi Fevzi akmak Caddesi Bur ak Sokak No 20 34848 Maltepe 3P650253 9H 2022 10 Copyright 20...

Reviews: