Preparing refrigerant piping

3.2.1

Refrigerant piping requirements

Piping material:

 Phosphoric acid deoxidised seamless copper.

Piping diameter:

Liquid piping

Ø6.4 mm (1/4")

Gas piping

Ø9.5 mm (3/8")

Piping temper grade and thickness:

Outer diameter

(Ø)

Temper grade

Thickness (t)

(a)

6.4 mm (1/4")

Annealed (O)

≥0.8 mm

t

Ø

9.5 mm (3/8")

Annealed (O)

(a)

Depending on the applicable legislation and the unit's
maximum working pressure (see "PS High" on the unit
name plate), larger piping thickness might be required.

3.2.2

Refrigerant piping length and height
difference

What?

Distance

Maximum allowable pipe length

15 m

Minimum allowable pipe length

1.5 m

Maximum allowable height difference

12 m

3.2.3

Refrigerant piping insulation

▪ Use polyethylene foam as insulation material:

▪ with a heat transfer rate between 0.041 and 0.052 W/mK (0.035

and 0.045 kcal/mh°C)

▪ with a heat resistance of at least 120°C

▪ Insulation thickness

Pipe outer diameter

p

)

Insulation inner

diameter (Ø

i

)

Insulation thickness

(t)

6.4 mm (1/4")

8~10 mm

≥10 mm

9.5 mm (3/8")

12~15 mm

Ø

i

Ø

i

t

Ø

p

Ø

p

If  the  temperature  is  higher  than  30°C  and  the  humidity  is  higher
than RH 80%, the thickness of the insulation materials should be at
least  20  mm  to  prevent  condensation  on  the  surface  of  the
insulation.

4

Installation

4.1

Opening the units

4.1.1

To open the outdoor unit

DANGER: RISK OF ELECTROCUTION

DANGER: RISK OF BURNING

2

1

2

4.2

Mounting the outdoor unit

4.2.1

To provide the installation structure

Prepare  4  sets  of  M8  or  M10  anchor  bolts,  nuts  and  washers  (field
supply).

20 mm

300

470

192

(mm)

192

>300

In  heavy  snowfall  areas,  it  is  recommended  to  provide  at  least
300  mm  of  free  space  below  the  unit.  For  other  areas,  it  is
recommended  to  provide  at  least  150  mm  of  free  space  below  the
unit.

In any case, make sure the unit is positioned at least 100 mm above
the  maximum  expected  level  of  snow.  If  necessary,  construct  a
pedestal.

Summary of Contents for ARXP20L5V1B

Page 1: ...stallation manual R32 split series English Installation manual R32 split series RXP20L5V1B RXP25L5V1B RXP35L5V1B ARXP20L5V1B ARXP25L5V1B ARXP35L5V1B RXF20A5V1B RXF25A5V1B RXF35A5V1B RXF20B5V1B RXF25B5V1B ...

Page 2: ... при условие че се използват съгласно нашите инструкции atitinka žemiau nurodytus standartus ir arba kitus norminius dokumentus su sąlyga kad yra naudojami pagal mūsų nurodymus tad ja lietoti atbilstoši ražotāja norādījumiem atbilst sekojošiem standartiem un citiem normatīviem dokumentiem sú v zhode s nasledovnou ými normou ami alebo iným i normatívnym i dokumentom ami za predpokladu že sa používa...

Page 3: ...us ir arba kitus norminius dokumentus su sąlyga kad yra naudojami pagal mūsų nurodymus tad ja lietoti atbilstoši ražotāja norādījumiem atbilst sekojošiem standartiem un citiem normatīviem dokumentiem sú v zhode s nasledovnou ými normou ami alebo iným i normatívnym i dokumentom ami za predpokladu že sa používajú v súlade s našim návodom ürünün talimatlarımıza göre kullanılması koşuluyla aşağıdaki s...

Page 4: ...is t e standardi te ga või teiste normatiivsete dokumentidega kui neid kasutatakse vastavalt meie juhenditele съответстват на следните стандарти или други нормативни документи при условие че се използват съгласно нашите инструкции atitinka žemiau nurodytus standartus ir arba kitus norminius dokumentus su sąlyga kad yra naudojami pagal mūsų nurodymus tad ja lietoti atbilstoši ražotāja norādījumiem ...

Page 5: ...components 11 4 6 2 To connect the electrical wiring on the outdoor unit 11 4 7 Finishing the outdoor unit installation 11 4 7 1 To finish the outdoor unit installation 11 4 7 2 To close the outdoor unit 11 5 Commissioning 11 5 1 Checklist before commissioning 11 5 2 Checklist during commissioning 12 5 3 To perform a test run 12 5 4 Starting up the outdoor unit 12 6 Disposal 12 6 1 Overview Dispos...

Page 6: ...tlet b Air inlet It is recommended to install a baffle plate when the air outlet is exposed to wind It is recommended to install the outdoor unit with the air inlet facing the wall and NOT directly exposed to the wind b a b c a Baffle plate b Prevailing wind direction c Air outlet 3 1 2 Additional installation site requirements of the outdoor unit in cold climates Protect the outdoor unit against ...

Page 7: ...rate between 0 041 and 0 052 W mK 0 035 and 0 045 kcal mh C with a heat resistance of at least 120 C Insulation thickness Pipe outer diameter Øp Insulation inner diameter Øi Insulation thickness t 6 4 mm 1 4 8 10 mm 10 mm 9 5 mm 3 8 12 15 mm Øi Øi t Øp Øp If the temperature is higher than 30 C and the humidity is higher than RH 80 the thickness of the insulation materials should be at least 20 mm ...

Page 8: ...ing the paint field supply 4 Attach the ends of the cables and tighten them 4 3 Connecting the refrigerant piping DANGER RISK OF BURNING 4 3 1 About connecting the refrigerant piping Before connecting the refrigerant piping Make sure the outdoor and indoor unit are mounted Typical workflow Connecting the refrigerant piping involves Connecting the refrigerant piping to the indoor unit Connecting th...

Page 9: ...t vacuum or CANNOT maintain the vacuum for 1 hour do the following Check for leaks again Perform vacuum drying again NOTICE Make sure to open the stop valves after installing the refrigerant piping and performing vacuum drying Running the system with the stop valves closed may break the compressor 4 5 Charging refrigerant 4 5 1 About charging refrigerant The outdoor unit is factory charged with re...

Page 10: ...he determined additional amount 4 5 5 To charge additional refrigerant WARNING Only use R32 as refrigerant Other substances may cause explosions and accidents R32 contains fluorinated greenhouse gases Its global warming potential GWP value is 675 Do NOT vent these gases into the atmosphere When charging refrigerant ALWAYS use protective gloves and safety glasses Prerequisite Before charging refrig...

Page 11: ...mply with applicable legislation 4 6 2 To connect the electrical wiring on the outdoor unit 1 Remove the service cover 2 Open the wire clamp 3 Connect the interconnection cable and power supply as follows 50 Hz 220 240 V c d f a b e a Interconnection cable b Power supply cable c Circuit breaker d Earth leakage circuit breaker e Power supply f Earth 3 4 Tighten the terminal screws securely We recom...

Page 12: ...ter the unit is turned OFF INFORMATION Even if the unit is turned OFF it consumes electricity When the power turns back on after a power break the previously selected mode will be resumed 5 4 Starting up the outdoor unit See the indoor unit installation manual for configuration and commissioning of the system 6 Disposal NOTICE Do NOT try to dismantle the system yourself dismantling of the system t...

Page 13: ...h if present on the indoor unit Method 2 Using the indoor unit user interface 6 3 1 To start stop forced cooling using the indoor unit ON OFF switch 1 Press the ON OFF switch for at least 5 seconds Result Operation will start INFORMATION Forced cooling stops automatically after 15 minutes 2 To stop operation sooner press the ON OFF switch 6 3 2 To start stop forced cooling using the indoor unit us...

Page 14: ... SWITCH E H HEATER F U FU FOR CHARACTERISTICS FUSE REFER TO PCB INSIDE YOUR UNIT FG CONNECTOR FRAME GROUND H HARNESS H P LED V L PILOT LAMP LIGHT EMITTING DIODE HAP LIGHT EMITTING DIODE SERVICE MONITOR GREEN HIGH VOLTAGE HIGH VOLTAGE IES INTELLIGENT EYE SENSOR IPM INTELLIGENT POWER MODULE K R KCR KFR KHuR K M MAGNETIC RELAY L LIVE L COIL L R REACTOR M STEPPER MOTOR M C COMPRESSOR MOTOR M F FAN MOT...

Page 15: ......

Page 16: ...LERİ SAN TİC A Ş İSTANBUL TÜRKİYE Tel 0216 453 27 00 Faks 0216 671 06 00 Çağrı Merkezi 444 999 0 Web www daikin com tr Gülsuyu Mahallesi Fevzi Çakmak Caddesi Burçak Sokak No 20 34848 Maltepe 3P519299 2H 2019 09 Copyright 2019 Daikin ...

Reviews: