6 Preparation
Installation and operation manual
11
EHYKOMB33A
Daikin Altherma hybrid heat pump – gas boiler module
4P353067-1K – 2020.10
Accessories Part number
Description
EKFGP5197
Chimney top PP 130 with
included flue pipe
EKFGS0252
Adapter flex-fixed PP 130
EKFGP6353
Support bracket top inox Ø130
EKFGS0250
Extension flex PP 130 L=130 m
EKFGP6366
Connector flex-flex PP 130
EKFGP1856
Flex kit PP Ø60-80
EKFGP4678
Chimney connection 60/100
EKFGP2520
Flex kit PP Ø80
EKFGP4828
Chimney connection 80/125
EKFGP6340
Extension Flex PP 80 L=10 m
EKFGP6344
Extension Flex PP 80 L=15 m
EKFGP6341
Extension Flex PP 80 L=25 m
EKFGP6342
Extension Flex PP 80 L=50 m
EKFGP6324
Connector-flex-flex PP 80
EKFGP6333
Spacer PP 80-100
EKFGP4481
Fixation Ø100
Accessories Part number
Description
EKFGV1101
Chimney connection 60/10
air intake Dn.80 C83
EKFGV1102
Connection set 60/10-60 Flue/
Air intake Dn.80 C53
EKFGW4001
Extension P BM-Air 80×500
EKFGW4002
Extension P BM-Air 80×1000
EKFGW4004
Extension P BM-Air 80×2000
EKFGW4085
Elbow PP BM-Air 80 90°
EKFGW4086
Elbow PP BM-Air 80 45°
EKGFP1289
Elbow PP/GALV 60/100 50°
EKGFP1299
Kit horizontal low profile PP/
GLV 60/100 (UK only)
INFORMATION
For extra configuration options regarding the flue gas
system, visit
INFORMATION
For the installation of the flue and air supply duct material,
see the manual included with the materials. Contact the
manufacturer of the relevant flue and air supply duct
materials for extensive technical information and specific
assembly instructions.
6
Preparation
6.1
Preparing the gas boiler
installation
Make sure that the hydrobox is already mounted to the wall.
It is recommended to first install:
▪ the water piping,
▪ the refrigerant piping,
▪ the electrical connection to the heat pump module.