IM 1240-4 • INTELLIGENT EQUIPMENT 16 www.DaikinApplied.com
Installation
Installing Rogowski Coil CT’s
(Not on Gateway-on-the-Go, IE Express, or
WMC kits)
Snap the Rogowski Coil CT connected to EMM terminal
CT_A on phase L1, the Rogowski Coil CT connected to
EMM terminal CT_B on phase L2, and the Rogowski Coil CT
connected to EMM terminal CT_C on phase L3 (
).
Ensure that the “Load” indicator on the CT is oriented correctly.
The molded arrow on the snap of the CT should be pointing
toward the load.
Figure 29: Rogowski Coil Power Supply Connection – AGZ
Figure 30: Rogowski Coil Power Supply Connection – AWV
Figure 31: Rogowski Coil Power Supply Connection – AWS
Figure 32: Rogowski Coil Installation