background image

INSTALLATION MANUAL

ADEQ35C2VEB
ADEQ50C2VEB
ADEQ60C2VEB
ADEQ71C2VEB
ADEQ100C2VEB
ADEQ125C2VEB

Split System air conditioners

4PEN461568-1.book  Page 1  Thursday, October 20, 2016  11:50 AM

Summary of Contents for ADEQ-C

Page 1: ...INSTALLATION MANUAL ADEQ35C2VEB ADEQ50C2VEB ADEQ60C2VEB ADEQ71C2VEB ADEQ100C2VEB ADEQ125C2VEB Split System air conditioners 4PEN461568 1 book Page 1 Thursday October 20 2016 11 50 AM ...

Page 2: ... 2 2 3 680 1 3 4 2 680 200 45 1 5 6 3 4 2 680 1 5 3 4 2 7 800 630 A B 2 1 4 3 4 1 1 2 1 3 5 2 125 460 160 160 300 375 1 3 2 460 7a 7b 4 4 A A 125 5 4 7 6 3 300 1 2 3 4 5 6a 6b 6c 7a 7b 7c 8 4PEN461568 1 book Page 1 Thursday October 20 2016 11 50 AM ...

Page 3: ...il Certificato C 07 Σημείωση όπως καθορίζεται στο A και κρίνεται θετικά από το B σύμφωνα με το Πιστοποιητικό C 08 Nota tal como estabelecido em A e com o parecer positivo de B de acordo com o Certificado C 09 Примечание как указано в A и в соответствии с положительным решением B согласно Свидетельству C 10 Bemærk som anført i A og positivt vurderet af B i henhold til Certifikat C 11 Information en...

Page 4: ... 5 m from the floor Where the air contains high levels of salt such as air near the ocean and where voltage fluctuates a lot e g in factories Also in vehicles or vessels Do not install accessories on the casing directly Drilling holes in the casing may damage electrical wires and consequently cause fire Sound pressure level is less than 70dB A Accessories Check if the following accessories are inc...

Page 5: ...h relevant European and national regulations 3 Use suspension bolts for installation Check whether the ceiling is strong enough to support the weight of the indoor unit If there is a risk reinforce the ceiling before installing the unit Preparations before installation 1 Relation of ceiling opening to unit and suspension bolt position See figure 5 For installation choose one of the possibilities a...

Page 6: ... side flange field supply Connect the flange to the main unit with accessory screws 7 Wrap the intake side flange and duct connection area with aluminum tape or something similar to prevent air escaping Air outlet side Connect the duct according to the air inside of the outlet side flange Wrap the outlet side flange and the duct connection area with aluminum tape or something similar to prevent ai...

Page 7: ...to the piping will create large quantities of oxidized film on the inside of the pipes adversely affecting valves and compressors in the refrigerating system and preventing normal operation When brazing while inserting nitrogen into the piping nitrogen must be set to 0 02 MPa with a pressure reducing valve just enough so that it can be felt on the skin Be sure to insulate the duct to prevent conde...

Page 8: ... check drainage in the manner described below Gradually pour approximately 1L of water from the outlet hole into the drain pan to check drainage Check the drainage When electric wiring work is finished Check drainage flow during COOL running explained in Test operation on page 8 When electric wiring work is not finished Remove the switch box cover and connect the single phase power supply and the ...

Page 9: ...e units When none are available follow the instructions below Do not connect wires of different gauge to the same power supply terminal Looseness in the connection may cause overheating When connecting wires of the same gauge connect them according to the figure Use the specified electric wire Connect the wire securely to the terminal Lock the wire down without applying excessive force to the term...

Page 10: ...he airflow automatic adjustment function Airflow automatic adjustment is the volume of blow off air that has been automatically adjusted to the rated quantity 1 Make sure the test run is done with a dry coil If the coil is not dry run the unit for 2 hours with fan only to dry the coil 2 Check if the power supply wiring to the air conditioning unit is completed along with the duct installation If a...

Page 11: ...eration accordingly to protect the unit 1 Open the gas side stop valve 2 Open the liquid side stop valve 3 Electrify crank case heater for 6 hours 4 Set to cooling operation with the remote controller and start operation by pushing ON OFF button 5 Press Inspection Test Operation button 4 times and operate at Test Operation mode for 3 minutes 6 Press Inspection Test Operation button and operate nor...

Page 12: ...CN E HA HE HL HN HR MR _A MR _B S U V W X A CONNECTION CONNECTOR Q L OVERLOADPROTECTOR D V D DIODE Q M THERMOSWITCH DB DIODEBRIDGE R RESISTOR DS DIPSWITCH R T THERMISTOR E H HEATER RC RECEIVER F U FU FORCHARACTERISTICS REFERTOPCBINSIDEYOURUNIT FUSE S C LIMITSWITCH FG CONNECTOR FRAMEGROUND S L FLOATSWITCH H HARNESS S NPH PRESSURESENSOR HIGH H P LED V L PILOTLAMP LIGHTEMITTINGDIODE S NPL PRESSURESEN...

Page 13: ...4PEN461568 1 book Page 1 Thursday October 20 2016 11 50 AM ...

Page 14: ...4PEN461568 1 book Page 2 Thursday October 20 2016 11 50 AM ...

Page 15: ...3 1 2 3 4 5 P1 P2 P1 P2 P1 P2 6 6 1 2 L N 3 2 3 2 3 1 2 3 4 5 P1 P2 P1 P2 6 L N L N 1 1 1 1 1 1 L N 1 2 3 L N 1 2 3 1 2 3 L N 1 2 3 1 2 3 L N 1 2 3 16 1 4 2 3 5 7 8 11 12 6 9 6 L N 1 2 3 P1 P2 F1 F2 T1 T2 Sec A A 15 14 A A A A 10 13 6 6 9 10 11 12 13 14 4PEN461568 1 book Page 1 Thursday October 20 2016 11 50 AM ...

Page 16: ...4P461568 1 2016 09 Copyright 2016 Daikin 4PEN461568 1 book Page 1 Thursday October 20 2016 11 50 AM ...