DAIHAN-Sci.com or
ALL
for
LAB.com
Shopping Mall
DAIHAN Scientific, Digital Rotary Evaporator 10/55
4.
Assemble the Bottle Opener, and then install the Glass Rotary Bottle (12) of assembly
components on the hook portion. Put down the Bottle after mounting so that the ring is
safely attached into the inlet of Rotary Bottle.
5.
To install the Glass Condenser in the left side of Glass Rotation Axis, Bottle opener should
be safely fixed in the right side.
Insert the Main Vacuum Seal (8) of Assembly components in the left side of Glass Rotation
Axis which is mounted on Main Body.
The Main Vacuum Seal should be mounted so that the
thin spring-loaded part is placed toward the Main body, and the part with two colors is
placed facing outward.
6.
Insert by pushing the Deputy Vacuum Seal (7) of assembly components up to the portion
which a Main Vacuum Seal is mounted, after mounting a Main Vacuum Seal entirely up to
the inside. Insert Deputy Vacuum Seal in the direction that the adhered tightening part is
facing the outside as shown in Figure.