9
2.2
Device Installation (Side Cable Exit)
Note
The installation surface has to sustain the total weight of device and its installation
structure, which is no less than 80kg.
Figure 2-2
Step 1 Dig three mounting hole sites on the cement block according to the mounting
holes, Make sure the size of hole diameter needs to be in accordance with
expansion bolt, and there shall be no deviation for hole site.
Step 2 Use a small hammer to knock the expansion bolts into the holes you just dug,
bury the expansion tube of expansion bolts into the wall and make it flat with the
installation surface.
Step 3 Insert the three mounting holes of camera through expansion bolts, cover it with
flat washer and spring washer successively, use nut to lock it firmly and fix the
device on the cement block stably.
Step 4 Connect the external cable well according to the use requirement.
Connect the corresponding power, video output, audio cable, RS485 control
cable, alarm input and output terminal according to requirement, and then
twine the cable connection location with insulated rubber tape to make it
waterproof.
Caution
The video port is covered the heat shrink tube of high shrinking ratio. After
the video connection, please heat the tube and wrap it with waterproof tape,
including other video connection ports. Make sure the video port is damp
proof and waterproof.
Connect the network cable to the corresponding network port of device
according to step 5.