3. Practical Work for Heavy Repair
COOLING CYCLE HEAVY REPAIR
1) Remove residual refrigerant more than 5 minutes later after
turning off the refrigerator. ( If not, compressor oil may leak inside.)
2) Remove retained refrigerant slowly by cutting first high pressure
side (drier part) with a nipper and then cut low pressure side.
1. Removal of residual
refrigerant.
Precautions
Items
Process
Compresso
Evaporato
Drye
High Pressure
Low
pressure
Suction
Discharge tube
Condense
Hot
Evaporato
* When replacing a drier:
Weld 1 and 2 parts by blowing nitrogen (0.1~0.2kg/cm2) to high
pressure side after assembling a drier.
* When replacing a compressor:
Weld 3 and 4 parts by blowing nitrogen to the low pressure side.
Note) For other parts, nitrogen blowing is not necessary because it
does not produce oxidized scales inside pipe because of its short
welding time.
2. Nitrogen blowing
welding.
- KEYPOINTING
Welding without nitrogen blowing produces oxidized scales inside
a pipe, Which affect on performance and reliability of a product.
Process
Compresso
Evaporato
Drye
High Pressure
Low
pressure
③
Condense
④
①
②
Hot
53
Summary of Contents for FRX-623B Series
Page 1: ...FPX6034501...
Page 4: ...2 Outside Diemension SPECIFICATIONS The real features are model dependent 3...
Page 24: ...WIRING DIAGRAM Basic Model 23...
Page 25: ...WIRING DIAGRAM Full Models 24...
Page 26: ...WIRING DIAGRAM Full Models_Inverter Comp 25...
Page 32: ...Evaporator in detail How to Disassemble Assemble for each part 31...
Page 34: ...7 Refrigerator Damper changing method How to Disassemble Assemble for each part 33...
Page 39: ...HOW TO Disassemble Assemble for each part 38...
Page 41: ...2 Freezing or cooling failure Weak cooling TROUBLE SHOOTING 40...
Page 44: ...6 Dews on Refrigerator Compartment TROUBLE SHOOTING 43...
Page 45: ...5 Refrigeration failure Foods does not get cool or cold soon TROUBLE SHOOTING 44...
Page 57: ...COOLING CYCLE HEAVY REPAIR Brzing Reference Drawings 56...