78
* Pipe Connection
Connect a red hose to the high pressure side and a blue hose
to the low pressure side.
* Vacuum Sequence
Open
①
,
②
valves and evacuate for 40 minutes.
Close valve
①
.
3.Vacuum degassing.
Precautions
Items
* Charging sequence
1)
Check the amount of refrigerant supplied to each model after
completing vacuum degassing.
2) Evacuate bombe with a vacuum pump.
3) Measure the amount of refrigerant charged.
- Measure the weight of an evacuated bombe with an electronic scale.
- Charge refrigerant into a bombe and measure the weight. Calculate
the weight of refrigerant charged into the bombe by subtracting the
weight of an evacuated bombe.
4.Refrigerant charging.
Compressor
Evaporator
Dryer
Condenser
Vaccum
Pump
Hot Pipe
Blue
Yellow
Red
High
Pressure
Low
Pressure
①
②
※
※
※
※
KEYPOINTING
1) If power is applied during vacuum degassing, vacuum degassing
shall be more effective.
2) Operate compressor while charging refrigerant. (It is easier and
more certain to do like this.)
the amount of refrigerant charged
= a weight after charging
- a weight before charging
(a weight of an evacuated cylinder)
Calculation of amount of refrigerant charged
※
※
※
※
KEYPOINTING
1) Be sure to charge
the refrigerant at
around 25
°
C.
2) Be sure to keep
-5g in the winter
and +5g in summer.
Indicate the weight of
an evacuated bombe
Summary of Contents for FRS(N)-U20IA
Page 4: ...3 2 EXTERNAL VIEWS 2 1 External Size FRS N U20IA...
Page 5: ...4 FRS N U20DA FRS N U20EA...
Page 6: ...5 FRS N U20FA FRS N U20GA...
Page 41: ...40 6 1 Wiring Diagram 6 DIAGRAM FRS N U20IA...
Page 42: ...41 FRS N U20DA EA FA GA...
Page 43: ...42 6 2 Circuit Diagram of Main PCB FRS N U20IA...
Page 44: ...43...
Page 45: ...44 FRS N U20DA EA FA GA...
Page 46: ...45...
Page 88: ...87 11 5 Dispenser Water Flow...
Page 89: ...88 CABINET 12 1 FRS N U20IA 12 EXPLODED VIEW PARTS LIST...
Page 90: ...89 MECH ROOM...
Page 91: ...90 R ROOM...
Page 92: ...91 F ROOM...
Page 93: ...92 F DOOR...
Page 94: ...93 R DOOR...
Page 99: ...98 CABINET 12 2 FRS N U20DA...
Page 100: ...99 MECH ROOM...
Page 101: ...100 R ROOM...
Page 102: ...101 F ROOM...
Page 103: ...102 F DOOR...
Page 104: ...103 R DOOR...
Page 110: ...109 CABINET 12 3 FRS N U20EA...
Page 111: ...110 MECH ROOM...
Page 112: ...111 R ROOM...
Page 113: ...112 F ROOM...
Page 114: ...113 F DOOR...
Page 115: ...114 R DOOR...
Page 121: ...120 CABINET 12 4 FRS N U20FA...
Page 122: ...121 MECH ROOM...
Page 123: ...122 R ROOM...
Page 124: ...123 F ROOM...
Page 125: ...124 F DOOR...
Page 126: ...125 R DOOR...
Page 132: ...131 CABINET 12 5 FRS N U20GA...
Page 133: ...132 MECH ROOM...
Page 134: ...133 R ROOM...
Page 135: ...134 F ROOM...
Page 136: ...135 F DOOR...
Page 137: ...136 R DOOR...