16
1. Defrost Mode
INPUT
CONTROL OBJECT
CONTENTS
REMARKS
1. Defrosting Cycle
1. Comp
2. F-Fan
3. R-Fan
4. D-Heater
Pre-Cool
Pause
Fan-Delay
Heater
Defrosting
Pre-Cool
1) Time : 50 minutes
2) Comp , F-fan : ON
R-fan : Control
D-HTR : OFF
3) If F-sensor
≤
-27
℃
, then Pre-Cool becomes. OFF
Heater
Defrosting
1) Comp, F-fan, R-fan : OFF
D-HTR : ON
2) Time limit
30 seconds : Heater is ON regardless of D-sensor
temperature right after defrosting start
30 minutes : in case of D1- Error
80 minutes : in normal control state
3) If D-sensor
≥
13
℃
, Heater Defrosting is OFF
Pause
Time : 7 minutes
Comp, F-fan, R-fan, Heater etc. : OFF
Fan-Delay
1) Time : 5 minutes
Comp : ON and F-fan, R-fan, Heater : OFF
4-2. Defrost Mode
2.The defrost mode start with the following conditions
1) Total operation time of comp. becomes : 6,8,10,……… 24 hours.
①
Comp. operating rate : more 85%
②
Total door open time : 2 minutes
(Any door, F or R open time is over 2 minutes.)
③
Any error mode : R1, F1, D1, F3, RT/S, Door-switch etc.)
2) Defrosting mode starts unconditionally as long as total comp. work time is
24 hours, even if the above conditions 1) are not satisfied.
3) Defrosting mode starts immediately as long as total time of [comp. ON +
comp. OFF] is over 60 hours, even if the above 1) and 2) conditions are not
satisfied.
3. In providing initial power (or returning power failure)
If D-sensor temp.
≤
3.5
℃
, defrosting mode starts .
Summary of Contents for FRS(N)-U20IA
Page 4: ...3 2 EXTERNAL VIEWS 2 1 External Size FRS N U20IA...
Page 5: ...4 FRS N U20DA FRS N U20EA...
Page 6: ...5 FRS N U20FA FRS N U20GA...
Page 41: ...40 6 1 Wiring Diagram 6 DIAGRAM FRS N U20IA...
Page 42: ...41 FRS N U20DA EA FA GA...
Page 43: ...42 6 2 Circuit Diagram of Main PCB FRS N U20IA...
Page 44: ...43...
Page 45: ...44 FRS N U20DA EA FA GA...
Page 46: ...45...
Page 88: ...87 11 5 Dispenser Water Flow...
Page 89: ...88 CABINET 12 1 FRS N U20IA 12 EXPLODED VIEW PARTS LIST...
Page 90: ...89 MECH ROOM...
Page 91: ...90 R ROOM...
Page 92: ...91 F ROOM...
Page 93: ...92 F DOOR...
Page 94: ...93 R DOOR...
Page 99: ...98 CABINET 12 2 FRS N U20DA...
Page 100: ...99 MECH ROOM...
Page 101: ...100 R ROOM...
Page 102: ...101 F ROOM...
Page 103: ...102 F DOOR...
Page 104: ...103 R DOOR...
Page 110: ...109 CABINET 12 3 FRS N U20EA...
Page 111: ...110 MECH ROOM...
Page 112: ...111 R ROOM...
Page 113: ...112 F ROOM...
Page 114: ...113 F DOOR...
Page 115: ...114 R DOOR...
Page 121: ...120 CABINET 12 4 FRS N U20FA...
Page 122: ...121 MECH ROOM...
Page 123: ...122 R ROOM...
Page 124: ...123 F ROOM...
Page 125: ...124 F DOOR...
Page 126: ...125 R DOOR...
Page 132: ...131 CABINET 12 5 FRS N U20GA...
Page 133: ...132 MECH ROOM...
Page 134: ...133 R ROOM...
Page 135: ...134 F ROOM...
Page 136: ...135 F DOOR...
Page 137: ...136 R DOOR...