16
INSPECTION AND MAINTENANCE
Preventive Maintenance
The equipment must be submitted to preventive maintenance with a maximum period of 3 years.
For protecting your equipment, look for a Alliage’ technical assistance for periodic reviews as
preventive maintenances.
Corrective Maintenance
Alliage states that the supplying of the circuits’ diagram, Part lists or any other information that
permits the technical assistance by the user, can be requested, since previously agreed between
the buyer and Alliage.
Attention
In case of the equipment presents any abnormality; check if the problem is related to some of
the listed items under the item Unpredictable (situation, cause and solution).
If it’s not possible to solve the problem, shutdown the equipment and demand the presence
of a Alliage technician from the nearest resale, or ask through the Attendance Service Alliage:
+ 55 (16) 3512-1212.
Item
Inspection description
Recommended
frequency
- Operating noise.
- Audibly, check the equipment for any ab-
normalities.
Daily
- Coupling.
- Make sure that the Air motors is well fixed to
the Delivery Unit terminal.
Daily
- Water leak.
- Check if the spray holes are leaking water.
Monthly
- Clogging.
- Check that the spray holes are not blocked.
Monthly
Periodic Inspection
It is imperative that this equipment is regularly inspected to ensure operational safety and functional
reliability.
The manufacturer is exempt from responsibility that the standard results do not conform in cases
where the user does not carry out the inspection recommended by the manufacturer.
The inspection must be carried out, documented and maintained with the equipment by the user
and is not part of the warranty of the same.
The table below gives a description of the main inspection items and recommended frequency.
If problems are detected during the inspection, perform the procedures described in the Corrective
Maintenance item.