EN
10.
After having installed the tap , the boiling water unit , the Combi installation kit and if
necessary the filter set, turn the main valve on the safety valve assembly open.
11.
Fill the boiler with water by opening the boiling water tap. The moment that water comes
out of the tap, the boiler is filled.
12.
Insert the plug into an earthed wall outlet. The boiling water unit will now heat the
water.
13.
If after 4 minutes, during heating, no expansion water leaks from through the safety valve
assembly , immediately switch the power off and open the boiling water tap to remove
the water pressure.
14.
It takes about 15 minutes to fully heat the boiling water unit .
15.
Before you put the boiling water unit into use, you should flush the heater for 3 minutes,
3 times over 1 hour.
Assembly
Assembly instructions Combi installation kit
7
7
7
7
1
2
1
Itho UK Ltd. 10 Faraday Court First Avenue Centrum 100 Burton on Trent Staffordshire DE14 2WX United Kingdom
Tel. +44 (0)1159 375179 E-mail: [email protected] www.daalderop.co.uk
07.98.92.033 Handleiding Combi Installatieset_NMRS.indd 10
5-7-10 16:29