background image

3

ELECTRICAL INSTALLATION

Internal wiring has been completed at the factory. Installer must route power to the wall switch and to the junction box 
located on the left end of the screen case.
standard installation is for a single 120VaC or 240VaC wall switch to control the screen. optional Control units may have 
been ordered. Wiring diagrams for the built-in VPI and low voltage control are included in these instructions. Refer to 
additional instructions for the external VPI, external low voltage control, sCb-100 and sCb-200. Refer to the appropriate 
wiring diagram for your screen.
Test installation by running screen up and down a few times. be prepared to stop screen. 
standard duty Cycle: 1mIn. on / 3 mIn. off.

NOTE: Must be installed in accordance with the requirements of the Local Building Codes, the Canadian Electrical Code (CEC), CAN/
CSA C22.1 and the National Electric Code (NEC), NFPA 70.

SCREEN AdjUSTMENT

screen travel is stopped automatically in the down and up positions by the limit switches that are preset at the factory. If 
it's necessary to adjust for more or less drop follow the steps below. 

CAUTION: Do not adjust for more drop than what was ordered. At least 1-1/2 wraps of fabric must remain on the roller. This 
screen comes standard with 12" black at the top. 

s

!

 

  CONTACT DA-LITE AT 800-622-3737 OR 574-267-8101 IF SCREEN MOTOR NEEDS ADjUSTMENT.

s

!

Summary of Contents for TENSIONED CONTOUR ELECTROL

Page 1: ...it Street Post Office Box 137 Warsaw Indiana 46581 0137 Phone 574 267 8101 800 622 3737 Fax 574 267 7804 Toll Free Fax 877 325 4832 www da lite com e mail info da lite com Instruction Book for Tension...

Page 2: ...with a current rating at least equal to that of the appliance should be used Cords rated for less amperage than the appliance may overheat 4 To reduce the risk of electric shock do not disassemble thi...

Page 3: ...fully seated on the bracket Tighten the stop screws against the wall bracket Ceiling Mount 1 Do not remove the wall mount bracket even if you are not using it for mounting This provides structural sta...

Page 4: ...creen Test installation by running screen up and down a few times Be prepared to stop screen Standard Duty Cycle 1MIN ON 3 MIN OFF NOTE Must be installed in accordance with the requirements of the Loc...

Page 5: ...The red wire from the VPI is the signal and the black wire from the VPI is the ground 2 Connect the wires from the VPI that are labeled Low Voltage Connection to the end of the extended screen trigger...

Page 6: ...ED to make any limit switch adjustments EVEN if a third party control system is used Therefore it is advised to wire the switch or provide a 3 conductor connection that is accessible UP STOP DOWN POWE...

Page 7: ...coming electric line b Replace fuse c Reset circuit breaker d Check above Tighten all loose wire connections Correct any improper connections Down Position Check for power across black and white leads...

Page 8: ...by the purchaser and Da Lite is not responsible for damage in shipment To protect yourself against damage or loss in transit insure the product and prepay all transportation expenses THIS WARRANTY IS...

Reviews: