xStack® DGS-3420 Series Layer 2+ Managed Stackable Gigabit Switch Hardware Installation Reference Guide
18
Chapter 2
Installation
Package Contents
Installation Guidelines
Power On (AC Power)
Alarm Connector
Installing SFP and SFP+ Ports
Connecting to a Redundant Power Supply
External Redundant Power System
Package Contents
Open the shipping carton of the Switch and carefully unpack its contents. The carton should contain the following items:
•
One DGS-3420 Series Switch
•
One AC power cord
•
One RJ-45 to RS-232 console cable
•
One mounting kit (two brackets and screws)
•
Four rubber feet with adhesive backing
•
One CD kit for CLI reference guide/Web UI reference guide/Hardware Installation Guide/D-View module
If any item is missing or damaged, please contact your local D-Link Reseller for replacement.
Installation Guidelines
Please follow these guidelines for setting up the Switch:
•
Install the Switch on a sturdy, level surface that can support at least 6.6 lb. (3kg – This is without PoE
functionality) of weight. Do not place heavy objects on the Switch.
•
The power outlet should be within 1.82 meters (6 feet) of the Switch.
•
Visually inspect the power cord and see that it is fully secured to the AC power port.
•
Make sure that there is proper heat dissipation from and adequate ventilation around the Switch. Leave at least
10 cm (4 inches) of space at the front and rear of the Switch for ventilation.
•
Install the Switch in a fairly cool and dry place for the acceptable temperature and humidity operating ranges.
•
Install the Switch in a site free from strong electromagnetic field generators (such as motors), vibration, dust, and
direct exposure to sunlight.
•
When installing the Switch on a level surface, attach the rubber feet to the bottom of the device. The rubber feet
cushion the Switch, protect the casing from scratches and prevent it from scratching other surfaces.