DWR-500 Quick Installation Guide
13
Example Configuration 1: Portal node
Step 1
Select the country where DWR-500 will
be installed. Based on Figure 26 and
Table 7, portal node is assigned as 1.
Finally, select the role of this node as
Portal. See Figure 28.
Figure 28. Step 1 setting up Portal Node.
Step 2
Shown in Figure 29, enter the Router
ID, IP Address/Mask, Ethernet Gateway
and enable NAT as per the Table 7.
Figure 29. Step 2 Setting up router details for Portal Node.
Step 3
Shown in Figure 30, enter the SSID and
the DNS information and the Portal Node
setup is complete. Hit the “Finish” button
to complete the setup.
Figure 30. Step 3 Complete Portal Node Setup.