D+H DYER ZA 35-BSY+ Instructions Manual Download Page 6

 Pin Assignment 

Connection 

(WH) 

white

(BN) 

brown

 

(OG) orange 
(YE) 

yellow

 

(GN) 

green

 

(PK) 

pink

 

(GY) 

grey

 

Option

-SA-SZ

WH (Mot. a)
BN (Mot. b)
OG (-HS)
YE (Data A)
GN (Data B)

GY (-SZ)
GN (-SZ)
PK (-SA)
YE (-SA)
WH (n.c.)
BN (n.c.)
OG (n.c.)

max. 50 V / 0,5 A

s

r

ZA-BSY+

19/20

Français / Español 

 

ZA-BSY+

99.824.31 1.4/04/16

Anschluss / Connection / Connexion / Conexión

?

1

2

3

4

5

L

6

N–

7

Z

A E/X

a

b

LT

Gruppe / Group / Groupe / Grupo

Mot. a

Mot. b

MOT

(BK)

(BK)

(OG)

2x47k

W

Endmodul

Terminal module

Module terminal

EM 47 K *

(WH)

(WH)

(BN)

(BN)

(OG)

(OG)

(YE)

(YE)

(GN)

(GN)

Mot. a

Mot. a

Mot. b

Mot. b

HS

HS

Data a

Data a

Data b

Data b

ZA-BSY+

ZA-BSY+

Slave(s)

Master 

Abzweigdose / Junction box / 
Boîte de dérivation / Caja de conexión

****

***

**

**

Mot. b 

(BN)

 Mot. a 

(WH)

zur Zentrale /
to control panel /
vers la centrale /
para central

Überwachung /

Monitoring /

Surveillance /

Supervisión*

Normalbetrieb / Normal mode /
Activité normale / Servicio normal

RWA- Schnelllauf / SHEV- fast running /
EFC fonctionnement rapide / Marcha rápida SVHC

High-Speed

High-Speed

***

High-Speed

Nicht bei / Not in case of / Pas pour / No en el caso : GVL -E/ -K/ -M

** 

Gegen Kurzschluss sichern / protect against short circuit / 
Protéger contre les courts-circuits / Proteger contra cortacircuitos

***  Bei Anschluss an D+H RWA Zentralen mit E/HS Leitungsüberwachung /

In case of connection to D+H SHEV control panels with E/HS line monitoring /
En cas de raccordement à des centrales D+H RWA, avec une surveillance des lignes E/HS /
En caso de conexión a paneles de control SVHC D+H con control de línea E/HS

****  Kabel gemäß D+H Kabelverlegetabelle (Siehe Gebrauchsanleitung der Zentrale) / 

Cable acc. to D+H table for layout of cables (see instructions for use of control panel) /
Câble selon le tableau de pose de câbles D+H (cf. le mode d'emploi de la centrale) /
Cable de acuerdo con tabla D+H sobre cables (ver instrucciones de uso de los paneles de control)

Option

-BRV

WH (Mot. a)
BN (Mot. b)
OG (-HS)
YE (Data A)
GN (Data B)

GY (-BRV)
PK (n.c.)

Standard 

WH (Mot. a)
BN (Mot. b)
OG (-HS)
YE (Data A)
GN (Data B)

Option

-SGI

WH (Mot. a)
BN (Mot. b)
OG (-HS)
YE (Data A)
GN (Data B)

GY (-SGI)
PK (+SGI)

Option

-SKS

WH (Mot. a)
BN (Mot. b)
OG (-HS)
YE (Data A)
GN (Data B)

GY (SKS)
PK (SKS)

Option

-SZ

WH (Mot. a)
BN (Mot. b)
OG (-HS)
YE (Data A)
GN (Data B)

GY (-SZ)
PK (-SZ)

max. 50 V / 0,5 A

s

Option

-SA

WH (Mot. a)
BN (Mot. b)
OG (-HS)
YE (Data A)
GN (Data B)

GY (-SA)
PK (-SA)

r

max. 50 V / 0,5 A

second connecting cable 

Summary of Contents for DYER ZA 35-BSY+

Page 1: ...Standard version Version without tube option OT Please order bracket sets separately B 08 11 22802 026 G 500001 ZA 35 85 105 155 BSY HS instructions...

Page 2: ...load of the toothed rack is not automatically identical with maximum pressure force of the drive Loads from over 1000 N to 1500 N are only briefly permissible e g to throwing off snow or with wind lo...

Page 3: ...1 2 A 1 0 A 2 0 A 1 2 A 2 2 A 1 4 A 2 5 A Nominal force 300 N 800 N 1000 N 1500 N Nominal locking force 1100 N Lifetime 20 000 double strokes Duty cycle 30 With cycle time 10 minutes Housing Aluminium...

Page 4: ...able Disconnect drive from electric voltage 1 Move out toothed rack about 10 20 mm Disconnect drive from electric Voltage 2 Take off drive unit and shift 3 Attention Moving direction of drive is chang...

Page 5: ...ices that are no longer usable must be collected separa tely and disposed of in an environmentally correct manner Disposal Declaration of Conformity We declare under our sole responsibility that the p...

Page 6: ...a BN Mot b OG HS YE Data A GN Data B GY BRV PK n c Standard WH Mot a BN Mot b OG HS YE Data A GN Data B Option SGI WH Mot a BN Mot b OG HS YE Data A GN Data B GY SGI PK SGI Option SKS WH Mot a BN Mot...

Page 7: ...b HS HS Data a Data a Data b Data b ZA BSY ZA BSY Slave s Master Junction box Mot b BN Mot a WH to control panel Monitoring Normal mode SHEV fast running High Speed High Speed High Speed Not in case o...

Page 8: ...6 0 46 104 9 13 6 30 30 9 7 Version without tube option OT 216 9 13 30 55 Nominal stroke 223 Dyer Environmental Controls Ltd Unit 10 Lawnhurst Trading Estate Cheadle Heath Stockport SK3 0SD Tel 44 0 1...

Reviews: