MB95560H/570H/580H Series MB2146-510-01-E Setup Guide, Doc. # 002-05587 Rev. *A
29
5.
Development Platform Quick Start
5.1
Tools Setup Sequence
Start the debugging system in the following sequence:
■
Connect a BGMA to the PC using a USB cable, confirm the LED on the BGMA is Green;
■
Connect an EV-board to BGMA IDC10 socket;
■
Select the EV-board power supply and turn on the EV-board, confirm the power LED on the
BGMA is Orange and the Power LED on the EV-board is on.
5.2
Open Project and Start Debug
Users can start a debug from a PC software SOFTUNE workbench in the following sequence. Here
take IO_LED project for example.
■
Start the SOFTUNE from "
Startup Menu>Programs> SOFTUNE V3> FFMC-8L Family
SOFTUNE Workbench
" in Windows;
■
Click "
Open workspace"
from "
File
" Menu in SOFTUNE;
■
Select "
IO_LED.wsp
" in "
Open Space
" window;
■
Click "
Start debug
" from "
Debug
" Menu.
If the entire procedure goes right, a debug will start normally.
5.3
Operation Precautions
■
All pins of MB95560H/570H/580H MCU are connected to Testing Pin on the EV-board. If the user
wants to test separate pin performance, do disconnect the header of related peripheral modules.
■
For the power of STK EV-board, do not use the different power supply (single-3 battery or 9V DC)
at the same time
■
Since the device and BGMA may be broken, please use the bundled BGMA with STK EV-board.