background image

 

 

 

 

 

 

 
 
 
 
 
 
 
 
 

User’s Manual 

CPSHB300ETR 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Cyber Power Systems, Inc. 

www.cyberpower.com

 

Summary of Contents for CPSHB300ETR

Page 1: ...User s Manual CPSHB300ETR Cyber Power Systems Inc www cyberpower com...

Page 2: ......

Page 3: ...n the Inverter 5 3 Product Description 6 3 1 CPS Hybrid PV Inverter Overview 6 3 2 Size and Weight 6 3 3 Transportation 7 3 4 Storage of Inverter 7 3 5 The Advantage of CPS Hybrid PV Inverters 7 4 Unp...

Page 4: ...19 7 2 USB Charger Only 19 7 3 Start up the Inverter for Off Grid Operation 19 7 4 Shut down the Inverter 20 8 Maintenance 21 8 1 Replace the Internal Batteries 21 8 2 Replace the Fuse 22 9 Decommissi...

Page 5: ...ited installation positions 10 Fig 5 2 Clearance space for installation 10 Fig 5 3 Grid output and standalone output connections 11 Fig 5 4 Connect PV connectors to inverter 12 Fig 5 5 The location of...

Page 6: ...of Figures Table 6 1 Charge current setting 15 Table 6 2 LEDs indicators for On Grid operation 16 Table 6 3 LEDs indicators for Off Grid operation 17 Table 10 1 Specification 24 Table 10 2 Torque valu...

Page 7: ...c will not inform users for any changes taken place within this guide 1 3 Symbols Used The following types of safety instructions and general information appear within this document Symbol Description...

Page 8: ...VDC USB devices such as Smart Phones Tablets Cameras etc Hybrid Energy Storage System Overview PV Module Electrical Grid Appliances Emergency usage Multiple charge 5V 2A 2A max for each USB and total...

Page 9: ...ment damage In order to minimize the potential of a shock hazard due to hazardous voltages cover the entire solar array with dark material prior to connecting the array to any equipment Grounding the...

Page 10: ...e is left over power fed into the public grid depending on your connection the energy consumption meter might be spinning backwards Ensure all covers and doors are closed and secure during operation A...

Page 11: ...ow the manual and instruction incorrect installation or operation may damage the product Danger to life due to high voltage Prior to performing any work on the product always disconnect it from all so...

Page 12: ...Transparent Cover C USB Charger D LED Indicators 4 LEDs E Operation Button F PV Input Connectors G External Battery Connector H AC out Power Outlet I AC in Power Outlet GRID J Tool for Removing PV Co...

Page 13: ...If you want to storage the inverter in your warehouse you should choose an appropriate location to store the inverter The unit must be stored in original package and desiccant must be left in the pac...

Page 14: ...re any damages or parts missing please contact your dealer Complete delivery should contain the following A B C Fig 4 1 Components included in the scope of deliver Item Quantity Description A 1 Hybrid...

Page 15: ...st 2 minutes after disconnecting all power sources Although designed to meet all safety requirements some parts and surfaces of inverter are still hot during operation To reduce the risk of injury do...

Page 16: ...al voltages High voltages which may cause electric shocks are present in the conductive parts of the inverter Prior to performing any work on the inverter disconnect the inverter on the AC and DC side...

Page 17: ...cuit voltage greater than the maximum input voltage of the inverter Please use the same brand male and female PV connectors Under any conditions the total circuit current should never exceed the Max C...

Page 18: ...Fig 5 4 Location of extended battery connector User Manual 12 Hybrid CPSHB300ETR...

Page 19: ...standalone output connections 6 Commissioning 6 1 Commission the Inverter 1 Remove the cover from the PV panel 2 Check the PV and AC voltage 3 If there s DC switch turn it to ON position If the invert...

Page 20: ...ailable Fault Mode The internal intelligent controller can continuously monitor and adjust the system state If inverter finds any fault conditions inverter would shutdown immediately Bypass Mode When...

Page 21: ...n set the charge current as 1 2 3 5 7 9A default is 1A Note The charger power comes from PV Larger charge current would reduce the feeding power to Grid and or loads Procedure for changing charge curr...

Page 22: ...or Orange to indicate Status or Operation modes Table 6 2 LEDs indicators for On Grid Self consumption or Bypass operation Flash frequency on off 2s 1s 0 5s 0 5s 0 2s 0 2s Status PV Panel Battery AC...

Page 23: ...Off Array impedance is too low Any Orange Off Grid is abnormal Any Red Off Internal fault occurs ex CT test fail relay test fail etc Table 6 3 LEDs indicators for Off Grid operation Flash frequency o...

Page 24: ...ge A C Orange Off Off PV panel voltage 50V Green Off A B C Orange Off Orange Inverter is operating with over load output power 240W or 300VA A Red Inverter is Off A Fault or Over Load or Low Battery c...

Page 25: ...er Only With PV power When PV voltage has sufficient power USB charger will automatically operate Without PV power 1 Make sure the inverter is staying in shutdown mode 2 Disconnect Off Grid plug 3 Pre...

Page 26: ...inverter supplies power to Standalone O P outlet if the battery voltage is higher than 22V PV Module Electrical Grid Appliances Emergency usage Multiple charge 5V 2A 2A max for each USB and total CPS...

Page 27: ...wait for 20minutes Risk of damage to the inverter Note the polarity of connection reverse connection can cause fuse open and inverter can t operate 1 Turn the unit off and disconnect all connections...

Page 28: ...and wait for 20minutes 1 Turn the unit off and disconnect all connections AC PV attached load and external battery connections wait for at least 2 minutes for any internal charge to dissipate 2 Pull o...

Page 29: ...sed completely and made to support both the weight and the size of the inverter 9 3 Disposing of the Inverter Do not dispose of faulty inverters or accessories together with household waste Please acc...

Page 30: ...attery Input internal Battery type VRLA rechargeable battery Operating voltage range 20 28 8Vdc Nominal voltage 24Vdc 12Vdc 2 Nominal Capacity 9Ah Shutdown voltage 20V for 100W 21V for 30 100W 22V for...

Page 31: ...ral Indicator PV Battery On Grid Off Grid LEDs Button One button for ON off and select functions Operation temperature range 10 50 de rating above 40 Storage temperature 20 40 Relative humidity 0 95 O...

Page 32: ...oncerning our products contact your installer or CyberPower During inquiring please provide below information 1 Model Name 2 Serial Number 3 Detailed Error Description Cyber Power Systems Inc www cybe...

Page 33: ...Note...

Page 34: ...Note...

Page 35: ......

Page 36: ...www CyberPower com K01 0000591 00...

Reviews: