Unit: mm
Fig. 3-2 Dimensions of CPSHB300ETR
3.3 Transportation
The inverter is thoroughly tested and inspected strictly before delivery. Our inverters leave our factory in
proper electrical and mechanical condition. Special packaging ensures safe and careful transportation.
However, transport damage may still occur. The shipping company is responsible in such cases. Thoroughly
inspect the inverter upon delivery. Immediately notify the responsible shipping company if you discover any
damage to the packaging which indicates that the inverter may have been damaged or if you discover any
visible damage to the inverter. We will be glad to assist you, if required. When transporting the inverter, the
original or equivalent packaging should to be used.
3.4 Storage of Inverter
If you want to storage the inverter in your warehouse, you should choose an appropriate location
to store the inverter.
The unit must be stored in original package and desiccant must be left in the package.
For the life and capacity of battery, the storage temperature should be always between
-10
℃
and +40
℃
. And the storage relative humidity should be always between 0 and 95%.
After long term storage, local installer or service department of CyberPower should perform a
comprehensive test before installation
3.5 The Advantage of CPS Hybrid PV Inverters
Features of CPSHB300ETR are follows:
User friendly handle, making carrying very convenient
Very easy to install
2 USB charger ports with 2A maximum charging current in total *1
Extendable battery capacity
*1 High power operation can cause high temperature and influence the charging current of USB, please
keep light or no power from AC-Out outlet during USB charging operation.
292
186
202
User Manual
7 Hybrid CPSHB300ETR
Summary of Contents for CPSHB300ETR
Page 1: ...User s Manual CPSHB300ETR Cyber Power Systems Inc www cyberpower com...
Page 2: ......
Page 18: ...Fig 5 4 Location of extended battery connector User Manual 12 Hybrid CPSHB300ETR...
Page 33: ...Note...
Page 34: ...Note...
Page 35: ......