Copyright © 2017 Cyber Power Systems, Inc.
HARDWARE INSTALLATION
5
VERTICAL/TOWER INSTALLATION
Step 1: Adhere the rubber feet on the bottom side of base stands
Adhere the protective rubber feet on the bottom side of UPS.
Step 2: Attach the base stands and attach the dust covers
Secure the tie bracket with the screws (M5X7*4pcs). Insert dust covers
into the screw holes that are not being used.
Step 3: Rotate the Multifunction LCD Module
Unscrew the upper panel of the UPS. Separate the upper panel from the
UPS. Gently lift the LCD module out. Rotate it to the tower orientation.
Reinstall it for a tower configuration.
ELECTRICAL INSTALLATION
After completing the hardware installation of the UPS, you are now ready
to plug in the UPS and connect your equipment.