background image

I.B. ATS-SD02

Page 20

Effective 5/98

Use a wide strap attached to an overhead crane for lift-
ing the switch. Tilt the switching device forward and slip
the strap underneath, placing it between the two draw-
out wheels on each side. Steady the sides of the switch-
ing device as the crane lifts it to ensure that it does not
slip off the strap. Lower all four wheels onto the top of
the switching device extension rails (Figure 4-7). The
front wheels on the switching device will fit into a depres-
sion at the front of the rails, and it will rest there securely.

Remove the strap. It will slide out between the switching
device and the extension rails. A molded escutcheon on
the switching device cell door is for mounting the label
for the indexing lever. This label indicates the position of
the switch. With the cell door in place attach the
escutcheon to the outside of the enclosure door.

Place the switching device in the TEST position. Peel the
backing off the label that indicates the position of the switch-
ing device and place it on the escutcheon so that the test
position indicator lines up correctly with the indexing lever.

4.7  WIRING

POWER CONDUCTORS AND CONTROL WIRING
MAY HAVE VOLTAGE PRESENT THAT CAN CAUSE
SEVERE PERSONAL INJURY OR DEATH.  DE-
ENERGIZE ALL POWER OR CONTROL CIRCUIT
CONDUCTORS BEFORE BEGINNING TO PERFORM
ANY WIRING ACTIVITY TO OR WITHIN THE TRANS-
FER SWITCH EQUIPMENT.

Power sources, load conductors and control wiring
should be connected to locations as indicated in the
Customer Wiring Diagrams supplied with the transfer
switch equipment.

4.7.1  ENGINE START CONNECTION

The engine control contact connections are located on the
lower right of the intelligence portion of the ATS (Figure 3-
7
).  The engine control contact connections of bypass isola-
tion units are located in the rear of the enclosure (51A,
52A).  NOTE: Prior to making the engine start connection to
the switch on bypass isolation units, set the engine genera-
tor controls selector switch in the OFF position to prevent an
unwanted engine start.  Connect the engine start wires to
the red terminal blocks marked in 51 and 52 or 51A and
52A for bypass isolation units.  A contact closes between
these terminal blocks when an engine start signal is provid-
ed by the ATS logic.

Figure 4-6  Secondary Control Block Contact Opening

Figure 4-7  Correct Placement

!

CAUTION

Figure 4-4  Drawout Stationary

Summary of Contents for ATVISPE31000XSU

Page 1: ...I B ATS SD02 Effective 5 98 Replaces I B ATS SDO1 dated October 1996 Cutler Hammer Instructions for Cutler Hammer Drawout Transfer Switch and Bypass Isolation Switch...

Page 2: ......

Page 3: ...THAT CAN CAUSE DEATH OR SEVERE PERSONAL INJURY FOLLOW PROPER INSTALLATION OPERATION AND MAINTENANCE PROCEDURES TO AVOID THESE VOLTAGES WARNING TRANSFER SWITCH EQUIPMENT COVERED BY THIS INSTRUCTION BOO...

Page 4: ...T DESCRIPTION 3 1 General 7 3 2 Power Panel 7 3 2 1 Main Contacts 7 3 2 2 Switch Interlocks 8 3 2 3 Drawout Interlocks 8 3 2 4 Transfer Mechanism 9 3 2 5 Drawout Mechanism 9 3 3 Voltage Selection Pane...

Page 5: ...Bypass 26 7 3 3 Normal to Emergency Bypass 29 7 3 4 Emergency to Normal Bypass 29 7 4 Manual Operation when in Bypass Mode 30 7 4 1 Normal Bypass to Emergency Bypass 30 7 4 2 Emergency Bypass to Norm...

Page 6: ...r Switch NEMA 1 Enclosure 16 4 3 Side View and Rear View of Power Panel 18 4 4 Drawout Stationary 20 4 5 Seismic Tested and Approved Product Mounting Instructions 19 4 6 Secondary Control Block Contac...

Page 7: ...FAMILIARIZE PERSON NEL WITH THE STYLE OF PRESENTATION THIS WILL HELP TO INSURE THAT PERSONNEL ARE ALERT TO WARNINGS WHICH APPEAR THROUGH OUT THE DOCUMENT IN ADDITION CAUTIONS ARE ALL UPPER CASE AND B...

Page 8: ...cal operation feature is added The switch electrically transfers power when an appropriate pushbutton on the front of the enclosure is pushed If necessary the switch can also be operated manually In a...

Page 9: ...e Rating Type kA 800 100 100 85 2000 L 200 1000 100 100 85 2000 L 200 1200 100 100 85 2000 L 200 1600 100 100 85 3000 L 200 2000 100 100 85 3000 L 200 2500 100 100 85 4000 L 200 3000 100 100 85 4000 L...

Page 10: ...ment catalog numbers provide a significant amount of relevant information that pertains to a particular piece of equipment The catalog number identification table Table 1 2 provides the required inter...

Page 11: ...e Enclosure Arrangement of Poles Rating Frequency Type Listing Drawout Insulated Case E Two 2 0600 120VAC 60Hz A No Enclosure K UL Listed U Switches both Sources Three 3 0800 208VAC 60Hz B Type 1 S Fo...

Page 12: ...not discard the packing material until the equipment is ready for installation A plastic bag of documents will be found within the enclosure usually attached to the inside of the door Important docume...

Page 13: ...tion Panel Logic Panel IQ Transfer Solid State The components comprising the three panels are installed in accordance with the specific requirements of the circuit being controlled Each transfer switc...

Page 14: ...mechanically interlocked to the drawout mechanism to ensure that the switching device is always open when connecting or disconnecting it from the line and load stabs LIFTING THE PADLOCK LATCH WHILE A...

Page 15: ...chanism The switching device is closed by energizing a solenoid that releases the spring mechanism A shunt trip will open the switching device if energized 3 2 5 DRAWOUT MECHANISM The drawout mechanis...

Page 16: ...scription More detailed selections that must be made within a specific option are lettered For available options associated with the logic scheme refer to the specific logic document associated with t...

Page 17: ...IQ Analyzer Emergency Only Q IQ Analyzer Both N E Selectable R DP 4000 Normal Only S DP 4000 Emergency Only T DP 4000 Both N E Selectable 20A Rear Bus Connections Solderless lugs are furnished as stan...

Page 18: ...y of lights switches and pushbuttons depending upon the options required for a particular switch All switch doors are supplied with a heavy duty plastic accessory panel in place whether or not externa...

Page 19: ...rogram which requires an extensive follow up testing program for listed devices Standard UL1008 for automatic transfer switches lists devices under the re examination program which only requires a con...

Page 20: ...d to retard the action of relays or cover the logic in a way that restricts adjustments Maintain proper electrical clearances between live metal parts and grounded metal For installation and maintenan...

Page 21: ...ergency Power Cable Connections Normal Power Cable Connections Emergency Power Cable Connections Neutral Cable Connection Grounding Right hand side when facing front switch F I G H F I G H Transfer Di...

Page 22: ...152 4 23 24 59 0 30 00 76 2 23 24 59 0 28 44 72 2 3400 1542 4 Pole 800 2000A 68 00 172 7 60 00 152 4 29 24 74 3 30 00 76 2 29 24 74 3 28 44 72 2 4000 1814 3 Pole 2500 3000A 82 00 208 3 60 00 152 4 29...

Page 23: ...plate on the intelli gence panel of transfer switch agree with sys tem current and voltage Step 3 After the transfer switch is mounted provide conduit or cable openings as required Ensure that no meta...

Page 24: ...R SELECTION AND OR CONNECTION COULD RESULT IN EQUIPMENT DAMAGE 4 6 MOUNTING SWITCHING DEVICE IN THE DRAW OUT MECHANISM When mounting the switching device in the drawout mechanism ensure that the exten...

Page 25: ...cleats must be ATVISP NTVSSP Figure 4 5 Seismic Tested and Approved Product Mounting Instructions Switch Type Amp Rating Mounting Bolt Torque ATVSSP 600 4000A 50 ft lbs 68 Nm NTVSSP 500 4000A 50 ft l...

Page 26: ...es up correctly with the indexing lever 4 7 WIRING POWER CONDUCTORS AND CONTROL WIRING MAY HAVE VOLTAGE PRESENT THAT CAN CAUSE SEVERE PERSONAL INJURY OR DEATH DE ENERGIZE ALL POWER OR CONTROL CIRCUIT...

Page 27: ...e manual handle without first isolating the control circuit causes an automatic transfer 5 2 AUTOMATIC TRANSFER SWITCH The operating sequence of an automatic transfer switch is dictated by the switch...

Page 28: ...ltage the logic causes the normal relay to pickup The normal relay closes certain contacts while opening others This starts the return to the normal power source and normal transfer switch operation D...

Page 29: ...CE IS IN THE CONNECTED POSITION The switching device will not close in the WITHDRAWN position 6 2 SWITCH POSITION The drawout mechanism has four positions They are achieved by lifting the padlock latc...

Page 30: ...H TO SER VICE WITHOUT INSTALLING THE DEADFRONT SHIELD Return the switching device to the desired position Replace the deadfront shield when the switch is in the DISCONNECT position 6 4 OPERATIONAL CHE...

Page 31: ...e causing the transfer switch to start the transfer sequence If the push button is held down the transfer switch will transfer the load to the emer gency switch Releasing the button will restore regu...

Page 32: ...sed light will no longer be illuminated 9 Remove the key from the normal bypass switch by turning the key counterclockwise while pushing up on the lever next to the key interlock This will lock the no...

Page 33: ...0 Operational High Load Communications Trip Time Overcurrent Curve Shape Pickup x In Time Multiplier Pickup x In Time Program Phase Ground I I I RMS Amperes Settings Test Time Trip Cause Test Program...

Page 34: ...000 Operational High Load Communications Trip Time Overcurrent Curve Shape Pickup x In Time Multiplier Pickup x In Time Program Phase Ground I I I RMS Amperes Settings Test Time Trip Cause Test Progra...

Page 35: ...k the emergency bypass switching device to prevent it from closing 10 Insert the key in the normal switching device and turn the key clockwise which will release the lever to the left of the key inter...

Page 36: ...ing 3 Insert the key in the emergency bypass switching device and turn it clockwise to release the lever to the left of the key interlock This will unlock the emergency bypass switching device 4 Open...

Page 37: ...OBLEM SOLV ING ONLY PROPERLY TRAINED PERSONNEL FAMILIAR WITH THE TRANSFER SWITCH EQUIPMENT AND ITS ASSOCIATED EQUIPMENT SHOULD BE PERMIT TED TO PERFORM THE PROBLEM SOLVING FUNC TION IF AN INDIVIDUAL D...

Page 38: ...A2 on the normal switching device spring release coil Does the voltage measure 120 VAC 10 volts Record reading If YES Check spring release coil in normal switching device If NO Check wiring to A1 and...

Page 39: ...ion by this type of equipment inspection and maintenance checks should be made on a regularly scheduled basis Since equipment maintenance will consist mainly of keeping the equipment clean the frequen...

Page 40: ...ity c Inspect switching devices for dust dirt soot Remove dust dirt soot grease moisture and corrosion grease moisture or corrosion contamination from the surface of the switching device using a dry s...

Page 41: ...I B ATS SD02 Page 35 Effective 5 98...

Page 42: ...I B ATS SD02 Page 36 Effective 5 98...

Page 43: ......

Page 44: ...tract between the purchaser and Cutler Hammer NO WARRANTIES EXPRESSED OR IMPLIED INCLUDING WARRANTIES OF FITNESS FOR A PAR TICULAR PURPOSE OR MERCHANTABILITY OR WARRANTIES ARISING FROM COURSE OF DEAL...

Reviews: